Laserfiche WebLink
INSPECTION REPORT' <br /> Date:@47r a� E ef.M it: ����✓ tom' y <br /> Contractor: Ak� <br /> Owner: <br /> Site Address: O 2,4 (n V <br /> TYPE OF INSPECTION REQUE D <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Vounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> W❑ eiling Grid F-1DrywallNailing El Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERM <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> �-c <br /> Inspector: Date: <br /> EIR(4/09) C�F RMS&PROMOTIONS 425/488-8900 <br />