Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit:&LT <br /> Contractor: <br /> Owner: <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Tem Service ❑LIFER ground ElGroundwork/Slab ❑Groundwork/Slab <br /> roun k ❑Footing ❑ Rough In ❑ Rough In <br /> b/Gond 't El Foundation El Ceiling Grid El Ceiling Grid <br /> ough In El Structural Slab ❑OK to insulate El OK to insulate <br /> El Service <br /> E:1 Framing ❑ Rooftop Units El Water Service <br /> dirig ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> O O LTATION: <br /> L�caPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> OK ❑ CORRECTION REQUESTED ❑ <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION -24 hour notice required <br /> e. <br /> _4e 3c c pr <br /> Inspector: � V/ Date: /5 <br /> EIR(4/09) )LSi-aV. FORM <„•,, ::. <br />