Laserfiche WebLink
J INSPECTION REPORT /. <br /> Date A Permit: <br /> AAddress: Contractor: -ToddOwner: <br /> E OF INSPE ION REQUESTED <br /> ELECTRICAL C1U_IL_D31 > MECHANICAL PLUMBING <br /> ❑Temp Service UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑,qtructural Slab ❑OK to insulate E]OK to insulate <br /> F1 Service Wraming ❑Rooftop Units E]Water Service <br /> [--IGrounding '❑IF10.1ulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains [:]Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final L]Gas <br /> Pipe Final n HWT Final <br /> OTHER OR CONSULTATION: • G"v . " \ SIA <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> F] OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 1"S 14 <br /> 5 <br /> nj <br /> O <br /> Inspector: Date: <br /> EIR(10/06) DA ABAR,INC. <br />