Laserfiche WebLink
INSPECTION REPORT <br /> Date:,:��.l Permit: <br /> T <br /> A Contractor: <br /> '� <br /> Owner: <br /> Site Address: `f <br /> TYPE OF INSPECTION REQUSTED <br /> ELECTRICAL BUILDING MECHANI AL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑ Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑R of Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑ eiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains kjBuilding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 71�Inspector: , stn M Date: ' <br /> EIR(4/09) )/2F RM_ PROMOTIONS•425/1 <br />