Laserfiche WebLink
I <br /> INSPECTION REPORT <br /> Date:rT - S Permit: C 130 1 0 [44 <br /> 4,, C) U Contractor: <br /> D� ` Owner: <br /> Site Address: Q 1 I q V/ Lq 1 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough in ough In <br /> ❑Slab/Conduit F1 Foundation [I Ceiling Grid Ceiling Grid <br /> F]Rough In ❑Structural Slab [I OK to insulate LlOK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing "gW-k l <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: ' • -3 7 38'73 <br /> ❑ APPROVAL ARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> T <br /> 5-Q-0tie <br /> A e,40 <br /> Inspector: Date: _ <br /> EIR(4/09) 1olws&raomo ilia-uPioo <br />