Laserfiche WebLink
INSPECTION REPORT <br /> &L7T Date: U S Permit: <br /> Contractor: -rte <br /> 1 <br /> Owner: <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ECT C L BUILDING MECHANICAL PLUMBING <br /> Temp e ce ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> Groun ork ❑Footing ❑ Rough In ❑ Rough In <br /> a /Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building <br /> gg7Final ❑Gas Pipe Final �n HW�T Final <br /> OTHER OR CONSULTATION: ` k L5 LA" ' y S <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(4250257-8881 FOR REINSPECTION-24 hour notice reggired <br /> �/— --- PE <br /> Inspector:��� Date: <br /> EIR(4/09) FOR &PROMOTIONS•425/488-8900 <br />