My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2517 HOWARD AVE SPRINT ANTENNA 2018-11-27
>
Address Records
>
HOWARD AVE
>
2517
>
SPRINT ANTENNA
>
2517 HOWARD AVE SPRINT ANTENNA 2018-11-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2018 9:12:25 AM
Creation date
9/29/2016 10:13:34 AM
Metadata
Fields
Template:
Address Document
Street Name
HOWARD AVE
Street Number
2517
Tenant Name
SPRINT ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NDICI <br /> E n G in E E RS <br /> E Seattle <br /> o Everett <br /> (i Spokane <br /> Portland <br /> C:' San Diego <br /> Austin September 28, 2012 <br /> U <br /> Rick Matteson <br /> Vinculums <br /> 3301 Burke Ave N, Suite 100 <br /> Seattle,WA 98103 <br /> Re: Sprint Site SE63XC209 Broadway <br /> Dear Rick: <br /> DCI Engineers has completed our review of the above referenced site. The site is an existing installation that is <br /> in the process of being upgraded. <br /> The proposed installation consists of the following equipment: <br /> • Three new Sprint 800/1900 MHz NV Antenna (weight=29.8 pounds/each)and 3 new Sprint 1900MHz <br /> RRU (weight=65 pounds/each) installed on an existing antenna frame mounted on an existing <br /> chimney. <br /> • One new Sprint BBU Cabinet(weight=2500 pounds/each) and one new Sprint MMBS Cabinet <br /> (weight=660 pounds/each) installed on an existing concrete slab-on-grade platform. <br /> Our review was based on information provided by Vinculums, including Structural calculations by Victor H. <br /> Rimsey Consulting Structural Engineers, dated 7-11-97, as-built drawings from KDC Architects dated 10-21-98, <br /> and 100% installation drawings dated 7-30-12. <br /> Based on our review,the structure and mounts are adequate to support the installation as proposed. <br /> • The HILTI KWIK Bolt-TZ anchors shown in detail 2/A-9 are placed at each corner of the cabinets(4 total <br /> per cabinet). <br /> • The existing antenna mount shown on detail 2/A-4 has a minimum of(10)%"diameter adhesive <br /> anchors to masonry.This needs to be verified by the contractor who performs the installation. <br /> Sincerely, <br /> DCI Engineers <br /> r <br /> .� <br /> 7, 21757 '��. .r <br /> O <br /> �JONA.. <br /> Wade Younie P.E., S.E. <br /> Principal <br /> Enclosure:Structural Calculations <br /> 818 Stewart Street,Suite 1000 Seattle,Washington 98101 Phone(206)332-1900 <br /> S e r v i c e I n n o v a t i o n V a I u e <br />
The URL can be used to link to this page
Your browser does not support the video tag.