Laserfiche WebLink
N <br /> lliil <br /> ill Illi iill I'ii Ilii .iii Ilii illi 1111111111 I ►111 R EXCISE D' <br /> 201603070262 4 PGS <br /> 0310712016 11:50am $76.00 MAR 0 3 2016 <br /> S'14H0MISH COUNTY; WASHINGTON KIRKE SIEVERS,Snononusb Countytreasurei <br /> RETURN ADDRESS: FY_. KIRKE 1EV4 <br /> Puget Sound Energy,Inc. ' :'J77 <br /> Attn: ROW Department <br /> 1660 Park Lane <br /> Burlington,WA 98233 <br /> PSE PUGET SOUND ENERGY EASEMENT <br /> GRANTOR(Owner): CITY OF EVERETT <br /> GRANTEE(PSE): PUGET SOUND ENERGY,INC. <br /> SHORT LEGAL: PTN LOT 11 BLA AFN 200608215004 AND BLA S3057 I WSEC 29 TWN 29N RGE 5E <br /> ASSESSOR'S PROPERTY TAX PARCEL: 29052900401000 c--A.Fyvxpo,N24,Z87 <br /> For good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the CITY OF <br /> EVERETT, a Washington municipal corporation ("Owner" herein), hereby grants and conveys to PUGET SOUND <br /> ENERGY, INC., a Washington corporation ("PSE" herein), for the purposes hereinafter set forth, a nonexclusive <br /> perpetual easement over, under,along, across, and through the following described real property("Property"herein) <br /> in SNOHOMISH County,Washington: <br /> SEE EXHIBIT A,ATTACHED HERETO AND INCORPORATED BY REFERENCE. <br /> 1. Purpose. PSE shall have the right to use the Easement Area to construct, operate, maintain, repair, <br /> replace, improve, remove, upgrade and extend one or more utility systems for purposes of transmission, distribution <br /> and sale of gas. Such systems may include,but are not limited to: <br /> Underground facilities. Conduits, vaults; pipes, pipelines, mains, laterals, conduits, regulators, gauges <br /> and rectifiers for gas; fiber optic cable and other lines, cables and facilities for communications; semi-buried <br /> or ground-mounted facilities and pads, manholes, meters, fixtures, attachments and any and all other <br /> facilities or appurtenances necessary for PSE's facilities. <br /> Following the initial construction of all or a portion of its systems,PSE may,from time to time,construct such <br /> additional facilities as it may require for such systems. PSE shall have the right of access to the Easement Area over <br /> and across the Property to enable PSE to exercise its rights granted in this easement. <br /> 2. Easement Area Clearing and Maintenance. PSE shall have the right, but not the obligation to cut, <br /> remove and dispose of any and all brush, trees or other vegetation in the Easement Area. PSE shall also have the <br /> right, but not the obligation, to control, on a continuing basis and by any prudent and reasonable means, the <br /> establishment and growth of brush,trees or other vegetation in the Easement Area. <br /> 3. Restoration. Following the initial installation, repair or extension of its facilities, PSE shall,to the extent <br /> reasonably practicable, restore landscaping and surfaces and portions of the Property affected by PSE's work to the <br /> condition existing immediately prior to such work. PSE shall use good faith efforts to perform its restoration <br /> obligations under this paragraph as soon as reasonably possible after the completion of PSE's work. <br /> 4. Owner's Use of Easement Area. Owner reserves the right to use the Easement Area for any purpose <br /> not inconsistent with the rights herein granted, provided, however, Owner shall not excavate within or otherwise <br /> change the grade of the Easement Area or construct or maintain any buildings or structures on the Easement Area <br /> and Owner shall do no blasting within 300 feet of PSE's facilities without PSE's prior written consent. <br /> 5. Indemnity. PSE agrees to indemnify Owner from and against liability incurred by Owner as a result of <br /> the negligence of PSE or its contractors in the exercise of the rights herein granted to PSE, but nothing herein shall <br /> Gas Easement 10/2013 <br /> 109085241/RW-089666 h yvn.O -R---r <br /> 141.083 <br />