My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1209 MADRONA AVE 2016-10-05
>
Address Records
>
MADRONA AVE
>
1209
>
1209 MADRONA AVE 2016-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 7:04:00 AM
Creation date
9/30/2016 4:12:32 PM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1209
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYES TESTING ENGINEERS, INC. Ste°' <br /> 20225 CedarValey <br /> Road <br /> Sate 110 <br /> EMAILED <br /> Project No. L14565 Ke/seaWork , pm, , ,, , ph4 .360 <br /> Project Packer Residence fax425.745.1737 <br /> Address 1209 Madrona Avenue, Everett, WA Tacoma Office <br /> Permit No. B1407-013 10029 S.Tacoma Way <br /> Bldg Dept. City of Everett stteE-2 <br /> Tacoma,WA 98499 <br /> ph 253.584.3720 <br /> Owner Packer Residence fax253-584.3707 <br /> Engineer CG Engineering Po eawoffibe <br /> Contractor Concrete Solutions, LLC 7911 NE 33rdDrke <br /> Srnfe 190 <br /> Portland,OR 97211 <br /> ph 503.281.7515 <br /> Record No. 001 fax 503.281.7579 <br /> Date 11/14/14 <br /> Weather Clear <br /> Inspection Shotcrete <br /> Sample(s) (1) shotcrete test panel <br /> Onsite for reinforcing steel inspection and shotcrete placement of retaining wall. Verified <br /> reinforcement per plan page and details on S2.2. Sampled and monitored the concrete placement <br /> of approximately 6 cubic yards of Cemex mix#1376928 by shotcrete method. Cast approximately <br /> 25' of 8"thick wall at 6' high. Compression testing requires 4000 psi at 28 days. <br /> To the best of our knowledge, all items inspected today are in conformance with approved plans <br /> and specifications. <br /> Inspector: Jesse Kane <br /> Reviewed By: <br /> Robert Gardner <br /> Senior Project Manager <br /> Information in this report applies only to the actual items inspected or tested and shall not be reproduced except in full,without the approval of Mayes Testing Engineers,Inc. <br /> Page 1 of 1 /1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.