Laserfiche WebLink
I ~ <br /> Robert Packer <br /> Subject: Geotech Final Approval Letter(2-17-2015), 1209 Madrona Ave Slope Stabilization <br /> Attachments: 87101313 Packer Retaining Wall Final Letter Feb 17_S.PDF <br /> From: Bob Packer [maiIto:bobheidi.packer(i)frontier.com] <br /> Sent: Tuesday, February 17, 2015 1:18 PM <br /> To: rallen(&ci.everett.wa.us; Paul McKee (PMckee@)everett:wa.gov) <br /> Subject: 1209 Madrona Ave Slope Stabilization <br /> Randy and Paul, <br /> All the work on the slope stabilization project at my home at 1209 Madrona Avenue has been completed (including the <br /> installation of the new retaining wall, erosion mats and plantings). Attached is the final report from the geotechnical <br /> engineer. <br /> Please let me know when you can conduct your inspection of the completed project. <br /> Thank you. <br /> Bob Packer <br /> 425-259-4847 <br /> 1 <br />