My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1209 MADRONA AVE 2016-10-05
>
Address Records
>
MADRONA AVE
>
1209
>
1209 MADRONA AVE 2016-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 7:04:00 AM
Creation date
9/30/2016 4:12:32 PM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1209
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Randy Allen <br /> From: Bob Packer <bobheidi.packer@frontier.com> <br /> Sent: Tuesday, February 17, 2015 1:18 PM <br /> To: Randy Allen; Paul McKee <br /> Subject: 1209 Madrona Ave Slope Stabilization <br /> Attachments: 8710B13 Packer Retaining Wall Final Letter-Feb 17_S.PDF <br /> Randy and Paul, <br /> All the work on the slope stabilization project at my home at 1209 Madrona Avenue has been completed (including the <br /> installation of the new retaining wall, erosion mats and plantings). Attached is the final report from the geotechnical <br /> engineer. <br /> Please let me know when you can conduct your inspection of the completed project. <br /> Thank you. <br /> Bob Packer <br /> 425-259-4847 <br /> From: Bob Packer [ma iIto:bobheidi.packer@frontier.com] <br /> Sent: Wednesday, January 07, 2015 6:37 PM <br /> To: 'Randy Allen' <br /> Cc: 'Paul McKee' <br /> Subject: RE: 1209 Madrona <br /> Randy, <br /> There has been a recent development. On 12-23-2014, 1 met with the geotechnical engineer on-site. We discussed in <br /> detail where all the erosion control mats should go and also all the type and spacing, etc., of the plants I'll be adding to <br /> the slope. <br /> During this discussion, I again brought up the subject of the "steep slumping slope just west of the new wall". As I noted <br /> in my 12-16-2014 email below, he had previously talked about working with the neighbor to remove this dirt.This time <br /> he said that this area will not be removed.Therefore, I'm planning to add the plants in the next few weeks. <br /> The geotech has agreed to write his approval letter for the whole project after he inspects the final mat and plant <br /> installation. <br /> So I hope to contact you soon with the letter in hand. <br /> Thanks, <br /> Bob Packer <br /> From: Randy Allen [mailto:RAllen@everettwa.gov] <br /> Sent: Tuesday, January 06, 2015 7:12 AM <br /> To: 'Bob Packer' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.