Laserfiche WebLink
� <br />�, <br />L_..Ir <br />Meg Haley �� �� —b3�j <br />From: Meg Haley <br />Sent: Thursday, September 24, 2015 5:10 PM <br />To: 'nmaddy@jmccabs.com' <br />Subject: Roofing questions <br />Hi Mr. Maddy, <br />I wanted to get back to you about the roofing questions that you had earlier this week, and what is required for permit. <br />In addition to what has already been submitted, we will need a written assessment from a licensed design professional to <br />confirm that the proposed new layer of roofing (the coating) can be added to the existing multi-layer roof. Please also <br />submit the manufacturers catalog cut which has the weight of the roofing material. <br />While you are waiting for the permit application to be completed and approved, any emergency roofing repairs can be <br />made immediately to keep the building water-tight. <br />The new layer of coating will have to wait until the permit has been issued, and at that time, then you can proceed with <br />that work and call for an inspection. <br />Please let me know if you have any concerns. <br />Nteg <br />ME� HALEY, RA � City of Everett Permit Services <br />3200 Cedar St, Everett WA 98201 � 425.257.8813 <br />mhaley@everettwa.�ov� �vwtiv.everetlw��,��v%Penmits <br />