THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS J-�AND THE CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE PERFORMED BY THE CONTRACTOR. <br /> SECTION 01 100 - SCOPE OF WORK SECTION 01 400 - SUBMITTALS & TESTS REMOTE ELECTRICAL TILT (RET) CABLES: A/E TO INSERT SPECIFICATION Sprint <br /> ALTERNATES: <br /> THE WORK: AT THE COMPANY'S REQUEST, ANY ALTERNATIVES TO THE MATERIALS OR MISCELLANEOUS: <br /> SHALL COMPLY WITH APPLICABLE NATIONAL CODES AND STANDARDS, LATEST EDITION, METHODS SPECIFIED SHALL BE SUBMITTED TO SPRINTS CONSTRUCTION INSTALL SPLITTERS, COMBINERS, FILTERS PER RF DATA SHEET, FURNISHED BY SPRINT. <br /> AND PORTIONS THEREOF. MANAGER FOR APPROVAL SPRINT WILL REVIEW AND APPROVE ONLY THOSE <br /> REQUESTS MADE IN WRITING. NO VERBAL APPROVALS WILL BE CONSIDERED. ANTENNA INSTALLATION: <br /> PRECEDENCE: THE CONTRACTOR SHALL ASSEMBLE ALL ANTENNAS ONSITE IN ACCORDANCE WITH THE <br /> SHOULD CONFLICTS OCCUR BETWEEN THE STANDARD CONSTRUCTION SPECIFICATIONS TESTS AND INSPECTIONS: INSTRUCTIONS SUPPLIED BY THE MANUFACTURER. ANTENNA HEIGHT, AZIMUTH, AND 1301 EAST LOOKOUT DRIVE <br /> FOR WIRELESS SITES INCLUDING THE STANDARD CONSTRUCTION DETAILS FOR FEED ORIENTATION INFORMATION SHALL BE A DESIGNATED ON THE CONSTRUCTION RICHARDSON.TX 75082-4124 <br /> WIRELESS SITES AND THE CONSTRUCTION DRAWINGS INFORMATION ON THE A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION DRAWINGS. <br /> CONSTRUCTION DRAWINGS SHALL TAKE PRECEDENCE. TESTS, INSPECTIONS AND PROJECT DOCUMENTATION. <br /> A. THE CONTRACTOR SHALL POSITION THE ANTENNA ON TOWER PIPE MOUNTS SO THAT FM <br /> B. CONTRACTOR SHALL ACCOMPLISH TESTING INCLUDING BUT NOT LIMITED THE BOTTOM STRUT IS LEVEL. THE PIPE MOUNTS SHALL BE PLUMB TO WITHIN 1 <br /> SITE FAMILIARITY: TO THE FOLLOWING: DEGREE. <br /> MORRISON HERSFiFIELD <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH ALL <br /> CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING 1. COAX SWEEPS AND FIBER TESTS PER LATEST VERSION OF TS-0200 B. ANTENNA MOUNTING REQUIREMENTS: PROVIDE ANTENNA MOUNTING HARDWARE AS 10900 NE 8TH STREET,SUITE 810 <br /> WITH CONSTRUCTION. ANTENNA LINE ACCEPTANCE STANDARDS. INDICATED ON THE DRAWINGS. BELLEVUE,WA 98004 <br /> Tel:425.451.1301 Fax:425.451.1369 <br /> ON-SITE SUPERVISION: 2. AGL, AZIMUTH AND DOWNTILT PROVIDE AN AUTOMATED REPORT HYBRID CABLE INSTALLATION: www.mordsonhershfield.00m <br /> UPLOADED TO SITERRA USING A COMMERCIAL MADE-FOR THE <br /> THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE PURPOSE ELECTRONIC ANTENNA ALIGNMENT TOOL (AAT). INSTALLED <br /> RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND AZIMUTH, CENTERLINE AND DOWNTILT MUST CONFORM WITH RF A. THE CONTRACTOR SHALL ROUTE, TEST, AND INSTALL ALL CABLES AS INDICATED ON <br /> PROCEDURES IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. CONFIGURATION DATA. THE CONSTRUCTION DRAWINGS AND IN ACCORDANCE WITH THE MANUFACTURER'S <br /> RECOMMENDATIONS. <br /> 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL <br /> DRAWINGS. SPECIFICATIONS AND DETAILS REQUIRED AT JOBSITE: CORRECTIONS TO ANY WORK IDENTIFIED AS UNACCEPTABLE IN SITE B. THE INSTALLED RADIUS OF THE CABLES SHALL NOT BE LESS THAN THE <br /> THE CONSTRUCTION CONTRACTOR SHALL MAINTAIN A FULL SET OF THE CONSTRUCTION INSPECTION ACTIVITIES AND/OR AS A RESULT OF TESTING. MANUFACTURER'S SPECIFICATIONS FOR BENDING RADIUS. <br /> DRAWINGS AT THE JOBSITE FROM MOBILIZATION THROUGH CONSTRUCTION COMPLETION. 8259 <br /> 4, ALL TESTING REQUIRED BY APPLICABLE INSTALLATION MOPS. C. EXTREME CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE CABLES DURING REGISTERED <br /> HANDLING AND INSTALLATION. <br /> A. DETAILS ARE INTENDED TO SHOW DESIGN INTENT. PROVIDE ALL MATERIALS AND C. REQUIRED CLOSEOUT DOCUMENTATION INCLUDES, BUT IS NOT LIMITED ARCHITECT <br /> LABOR AS REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM. TO THE FOLLOWING: 1. FASTENING MAIN HYBRID CABLES: ALL CABLES SHALL BE INSTALLED INSIDE <br /> MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS, AND MONOPOLE WITH CABLE SUPPORT GRIPS AS REQUIRED BY THE MANUFACTURER. <br /> SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. 1. AZIMUTH, DOWNTILT, AGL FROM SUNSIGHT INSTRUMENTS - <br /> ANTENNALIGN ALIGNMENT TOOL (AAT) 2. FASTENING INDIVIDUAL FIBER AND DC CABLES ABOVE BREAKOUT ENCLOSURE ROBERT JERRY LARA <br /> (MEDUSA), WITHIN THE MMBTS CABINET AND ANY INTERMEDIATE DISTRIBUTION STAF IVASHING I 'N <br /> B. CONTRACTOR SHALL NOTIFY SPRINT CONSTRUCTION MANAGER OF ANY VARIATIONS 2. SWEEP AND FIBER TESTS BOXES: _ <br /> PRIOR TO PROCEEDING WITH THE WORK. DIMENSIONS SHOWN ARE TO FINISH - <br /> SURFACES UNLESS NOTED OTHERWISE. MODIFICATIONS MAY BE REQUIRED TO SUIT 3. SCALABLE BARCODE PHOTOGRAPHS OF TOWER TOP AND INACCESSIBLE a. FIBER: SUPPORT FIBER BUNDLES USING 1/2" VELCRO STRAPS OF THE <br /> JOB DIMENSIONS OR CONDITIONS, AND SUCH MODIFICATIONS SHALL BE INCLUDED SERIALIZED EQUIPMENT REQUIRED LENGTH ® 18" OC. STRAPS SHALL BE UV, OIL AND WATER <br /> RESISTANT AND SUITABLE FOR INDUSTRIAL INSTALLATIONS AS MANUFACTURED ofessional of Record <br /> AS PART OF THE WORK. <br /> 4. ALL AVAILABLE JURISDICTIONAL PERMIT AND OCCUPANCY INFORMATION <br /> BY TEXTOL OR APPROVED EQUAL. Pr 25 20140BERT JERRYREGISTERED ARCHfTECT <br /> C. MARK THE FIELD SET OF DRAWINGS IN RED, DOCUMENTING ANY CHANGES FROM 5. PDF SCAN OF REDLINES PRODUCED IN FIELD STATE OF WASHINGTON <br /> THE CONSTRUCTION DOCUMENTS. b. DC: SUPPORT DC BUNDLES WITH ZIP TIES OF THE ADEQUATE LENGTH. ZIP 8259 <br /> 6. A PDF SCAN OF REDLINE MARK-UPS SUITABLE FOR USE IN TIES TO BE UV STABILIZED, BLACK NYLON, WITH TENSILE STRENGTH AT <br /> ELECTRONIC AS-BUILT DRAWING PRODUCTION 12,000 PSI AS MANUFACTURED BY NELCO PRODUCTS OR EQUAL. <br /> MH PROJECT NO.: 7140007 <br /> METHODS OF PROCEDURE (MOPS) FOR CONSTRUCTION: <br /> 7. LIEN WAVERS <br /> CONTRACTOR SHALL PERFORM WORK AS DESCRIBED IN 3. FASTENING JUMPERS: SECURE JUMPERS TO THE SIDE ARMS OR HEAD FRAMES © PRELIMINARY <br /> 8. FINAL PAYMENT APPLICATION USING STAINLESS STEEL TIE WRAPS OR STAINLESS STEEL BUTTERFLY CLIPS. NO. DATE D C DESCRIPTION <br /> A. COAX COLOR CODING SWEEPS AND FIBER TESTING TS-0200 AND EL-0568 <br /> 9. REQUIRED FINAL CONSTRUCTION PHOTOS 4, CABLE INSTALLATION: A04/15/14OR/DS 90% CD REVIEW <br /> B. CABLE LABELING EN-2012-00 <br /> 10. CONSTRUCTION AND COMMISSIONING CHECKLIST COMPLETE WITH NO <br /> C. APPLICABLE INSTALLATION MOPS IDENTIFIED ELSEWHERE IN THE CONTRACT <br /> DEFICIENT ITEMS a. INSPECT CABLE PRIOR TO USE FOR SHIPPING DAMAGE, NOTIFY THE <br /> CONSTRUCTION MANAGER. SUBMITTAL <br /> DOCUMENTS 11. APPLICABLE POST NTP TASKS INCLUDING DOCUMENT UPLOADS <br /> COMPLETED IN SITERRA (SPRINTS DOCUMENT REPOSITORY OF b. CABLE ROUTING: CABLE INSTALLATION SHALL BE PLANNED TO ENSURE THAT N60 DATE D C DESCRIPTION <br /> SECTION 01 200 - COMPANY FURNISHED MATERIAL AND EQUIPMENT RECORD) THE LINES WILL BE PROPERLY ROUTED IN THE CABLE ENVELOP AS INDICATED 0 04/24 14 OR MS 100% SUBMITTAL <br /> COMPANY FURNISHED MATERIAL AND EQUIPMENT IS IDENTIFIED ON THE RF DATA ON THE DRAWINGS. AVOID TWISTING AND CROSSOVERS. <br /> SHEET IN THE CONSTRUCTION DRAWINGS. 12. CLOSEOUT PHOTOGRAPHS AND CLOSEOUT CHECKLISTS: SPRINT <br /> WILL PROVIDE SEPARATE GUIDANCE c. HOIST CABLE USING PROPER HOISTING GRIPS. DO NOT EXCEED <br /> CONTRACTOR IS RESPONSIBLE FOR SPRINT PROVIDED MATERIAL AND EQUIPMENT TO MANUFACTURERS RECOMMENDED MAXIMUM BEND RADIUS. SITE NUMBER <br /> ENSURE IT IS PROTECTED AND HANDLED PROPERLY THROUGHOUT THE CONSTRUCTION SECTION 11 - ANTENNA ASSEMBLY, REMOTE RADIO SE54XCO19 <br /> DURATION. UNITS AND CABLE <br /> E INSTALLATION <br /> SUMMARY. CCI SITE # 826263 <br /> CONTRACTOR RESPONSIBLE FOR RECEIPT OF SPRINT FURNISHED EQUIPMENT AT CELL THIS SECTION SPECIFIES INSTALLATION OF ANTENNAS, RRH'S AND SITE NAME <br /> SITE OR CONTRACTORS LOCATION. CONTRACTOR TO COMPLETE SHIPPING AND RECEIPT <br /> DOCUMENTATION IN ACCORDANCE WITH COMPANY PRACTICE. CABLE EQUIPMENT, INSTALLATION, AND TESTING OF COAXIAL FIBER SEAWAY <br /> CABLE. <br /> SECTION 01 300 - CELL SITE CONSTRUCTION ANTENNAS AND RRH'S: SITE ADDRESS <br /> THE NUMBER AND TYPE OF ANTENNAS AND RRH'S TO BE INSTALLED IS 2215 MERRILL CREEK PARKWAY <br /> NOTICE TO PROCEED: DETAILED ON THE CONSTRUCTION DRAWINGS. EVERETT, WA 98203 <br /> NO WORK SHALL COMMENCE PRIOR TO COMPANY'S WRITTEN NOTICE TO PROCEED AND HYBRID CABLE: <br /> THE ISSUANCE OF WORK ORDER. <br /> HYBRID CABLE WILL BE DC/FIBER AND FURNISHED FOR INSTALLATION SHEET TITLE <br /> SITE CLEANLINESS: AT EACH SITE. CABLE SHALL BE INSTALLED PER THE CONSTRUCTION <br /> CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATING WASTE MATERIAL, DRAWINGS AND THE APPLICABLE MANUFACTURER'S REQUIREMENTS. <br /> DEBRIS, AND TRASH. AT THE COMPLETION OF THE WORK, CONTRACTOR SHALL GENERAL NOTES <br /> REMOVE FROM THE SITE ALL REMAINING RUBBISH, IMPLEMENTS, TEMPORARY JUMPERS AND CONNECTORS: <br /> FACILITIES, AND SURPLUS MATERIALS. FURNISH AND INSTALL 1/2" COAX JUMPER CABLES BETWEEN THE <br /> RRH'S AND ANTENNAS. JUMPERS SHALL BE TYPE OF 4, FLO 12-50, <br /> OR 540, OR FXL 540. SUPER—FLEX CABLES ARE NOT ACCEPTABLE. <br /> JUMPERS BETWEEN THE RRH'S AND ANTENNAS OR TOWER TOP SHEET NO. <br /> AMPLIFIERS SHALL CONSIST OF 1/2 INCH FOAM DIELECTRIC, OUTDOOR <br /> RATED COAXIAL CABLE, MIN LENGTH FOR JUMPER SHALL BE 10'-0". <br /> N- 1 <br /> 2 �� <br />