Laserfiche WebLink
April 30, 2014 <br /> 150 Ft Monopole Tower Structural Analysis Report CCI BU No. 826263 <br /> Project Number 92189.001.01, Application 207119, Revision 4 Page 2 <br /> TABLE OF CONTENTS <br /> 1) INTRODUCTION <br /> 2)ANALYSIS CRITERIA <br /> Table 1 - Proposed Antenna and Cable Information <br /> Table 2 - Existing and Reserved Antenna and Cable Information <br /> Table 3- Design Antenna and Cable Information <br /> 3)ANALYSIS PROCEDURE <br /> Table 4- Documents Provided <br /> 3.1)Analysis Method <br /> 3.2)Assumptions <br /> 4)ANALYSIS RESULTS <br /> Table 5 -Section Capacity (Summary) <br /> Table 6—Tower Components vs. Capacity <br /> 4.1) Recommendations <br /> 5)APPENDIX A <br /> tnxTower Output <br /> 6)APPENDIX B <br /> Base Level Drawing <br /> 7)APPENDIX C <br /> Additional Calculations <br /> tnxTower Report-version 6.1.4.1 <br />