My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6605 MERRILL CREEK PKY 2016-10-05
>
Address Records
>
MERRILL CREEK PKY
>
6605
>
6605 MERRILL CREEK PKY 2016-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 8:07:11 AM
Creation date
10/3/2016 8:59:54 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/16/2016 Page 1 <br /> City of Everett <br /> 7:56:59AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1402-027 Site Address 6605 MERRI L CREEK PKWY <br /> Applied 2/18/2014 Applicant Lot <br /> Approved 4/3/2014 Owner SNBL USA LTD Block <br /> Issued 4/3/2014 Contractor OWNER Tract <br /> Parent Permit No. Description ADDITION TO EXISTING BLDG-SNBL USA <br /> Notes ARS MACHINE-N END OF MAIN BLDG <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 4/25/2014 Consultation KMK PartialApproval See notes Please send Special Inspection reports to <br /> kkeck@everettwa.gov or <br /> dfoster@everettwagov <br /> 5/9/2014 5/9/2014 Foundation KMK Corr Reqd See notes 1)Plans and permit not on site <br /> 2)Please provide special inspection report <br /> or recall when ready <br /> 5/16/2014 5/16/2014 Bldg Other KMK PartialApproval See notes Re:Stem walls,special inspection will be <br /> sent <br /> 6/2/2014 6/2/2014 Site Visit KMK PartialApproval See notes Site visit <br /> Getting ready to pour roof <br /> Special inspection reports being sent to City <br /> of Everett <br /> 6/13/2014 6/13/2014 Roof Nailing KMK PartialApproval Roof-OK to cover <br /> 6/30/2014 6/30/2014 Framing KMK Approval See notes Please leave any areas with mechanical <br /> open for inspection <br /> 7/7/2014 7/7/2014 InsulBldg KMK Approval OK to rock <br /> 7/18/2014 7/18/2014 Final Bldg DWF PartialApproval See notes OK in install machine in lab room-Phase I. <br /> Need electrical final. <br /> 8/5/2014 8/5/2014 Final Bldg KMK PartialApproval See notes Phase I:TCO apprpved pending final on <br /> fire inspection for phase#1(building) <br /> 10/20/2014 Consultation KMK Footing,see notes Super Steve. Site visit. Met with Neil <br /> Davis(Facilities super) <br /> Note:New footing poured last Friday and <br /> Special Inspections reort will be sentby <br /> MTC. <br /> INSP12AS <br /> 11680F1' . <br />
The URL can be used to link to this page
Your browser does not support the video tag.