Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 4/1/2014 <br /> Public Works Permit#: PW1404-001 <br /> City of Everett Public Works Department <br /> y� 3200 Cedar Street Building Permit#; B1402-027 <br /> Everett, WA 98201 <br /> (425) 257-8810 Planning Reference#: <br /> ` Public Works Fee$: $ 222.75 <br /> _.C. Other $: <br /> s <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SNBL USA LTD <br /> 16203 121ST AVE NE <br /> BOTHELL WA 98011 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 28040200301000 SITE ADDRESS: 6605 MERRILL CREEK PKWY <br /> DESCRIPTION OF PROPOSED WORK: <br /> WATER MAIN CONSTRUCTION-SNBL USA <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2• All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Per approved plan dated 3/12/2014. t� <br /> Your Public Works Inspector is Randy Allen. Call 425-339-7403 for any questions and/or inspections: � 't <br /> r•5 :. <br /> d <br /> �1qqf O <br /> -.ry, "N i—'•e�„a I XI I-.:7 ::_ C._r'I 1:Yl Cr O <br /> 1[J,7 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> to remove same upon notice from the City and to replace <br /> Approved r C nstru Date public prop y damaged thereby. <br /> 7/, <br /> FINAL INSPECt ION Date ivzt� <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />