Laserfiche WebLink
CITY OF EVERETT 2015 TO 2020 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Project PROJECT PRIO- PE RAN CONST. Est.2015-20 LEAD MAP <br /> Number TYPE RITY PROJECT NAME START START START Expenditures AGENCY NO. <br /> 41 Local Access-SAF 1 BNSF RR safety improvements Jan.15 Jun.16 '60 ;•00. * EVERETT <br /> 42 Local Access-SAF 2 Local Roadway Safety Projects Jan.15 Jun.16 "2• • ' EVERETT <br /> 43 Local Access-SAF 3 Safe Routes to Schools Jan.15 Apr.16 •• ,a•• EVERETT <br /> 44 Local Access-PR/M 1 Bridge Rehabilitation Program Jan.15 Jul.16 $ '000 "ETT <br /> 45 Local Access-PR/M 2 Annual Street Overlay Program Jan.15 Jul.16 $•,04 •0 ' RETT <br /> 46 Local Access-PR/M 3 Sidewalk repair and replacement Jan.15 May 16 360,• * EVERETT <br /> 47 Local Access-PR/M 4 Pavement Marking Project Jan.15 May 16 •,001! EVERETT <br /> 48 Local Access-STR 1 106th Place SE Improvements Nov.10 Jun.16 •0 * EVERETT 35 <br /> 49 Local Access-STR 2 3rd Avenue SE Street Improvements Jan.15 Apr.1 • •,000 * EVERETT 36 <br /> 50 Local Access-STR 3 Local Street Improvements Jul.15 M ;0,000 * EVERETT <br /> 51 Local Access-STR 4 Upper&Lower Ridge Rd.Str.Improv. Aug.15 n. $300,000 * EVERETT 37 <br /> 52 Local Access-STR 5 Simpson Site Access Improvements Aug.15 6 $2,000,000 * EVERETT 38 <br /> 53 Local Access-STR 6 Downtown Streetscape Improvements Jul.14 _ .15 Ap $8,000,000* EVERETT 39 <br /> 54 Local Access-SIG 1 Traffic Signal Central Controller Replacement Jan.15 Jul. $600,000 * EVERETT <br /> 55 Local Access-SIG 2 Traffic Signal Interconnect Jan.15 Ma 4 $240,000 * EVERETT <br /> 56 Local Access-SIG 3 Traffic Signal Improvements .15 5 $900,000 * EVERETT <br /> 5/ Local Access-SIG 4 Traffic Sign Improvements :;+ ,5 n.15 $500,000 * EVERETT <br /> 58 Local Access-NEI 1 Neighborhood Block Grants Ja• `'i May.15 $360,000 * EVERETT <br /> 59 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects • ;; May.15 $2,400,000 * EVERETT <br /> 60 Local Access-NEI 3 Residential Sidewalks .n.15 May.15 $2,400,000 * EVERETT <br /> 61 Local Access-NM - 2 East Grand Walkway Connection 10 Jul 16 $850,000 * EVERETT 40 <br /> 62 Local Access-NM 3 Henry Jackson Park Ped Bridge J= ;*: , ay.16 Jul.18 $2,700,000 * EVERETT 41 <br /> 63 Local Access-NM 4 36th Street/BNSF Rail Line Ped/Bike Crossing J i.08 Nov.16 Jun.17 $2,800,000 * EVERETT 42 <br /> 64 Local Access-NM 5 Smith Island Bike/Ped improvements .10 Jan.16 May 18 $1,000,000 * EVERETT 43 <br /> 65 Local Access-NM 6 Bicyle Master Plan Implementation .15 Jan.16 $200,000 * EVERETT <br /> 66 Local Access-NM 7 Riverside Business Park Ped trail pr.09 Apr.16 $700,000 * EVERETT 44 <br /> 67 Local Access-NM 8 West/East Marine View Drive Bike-Ped Improve is Aug.09 Apr.16 $500,000 ' EVERETT 45 <br /> 68 Local Access-NM 9 47th Street Pedestrian Improvements Jan.15 Jun.16 $500,000 * EVERETT 46 <br /> 69 Local Access-NM 10 Pigeon Creek No.1/BNSF Crossing Jan.10 Jul.16 Jan.17 $925,000 ' EVERETT 47 <br /> 70 Local Access-NM 11 Grand Ave./N.Marina Ped-Bike Conn- • Jan.15 Jan.16 May.17 $1,050,000 ' EVERETT <br /> 71 Local Access-NM 12 Shoreline Access Improvements Apr.15 Jan.16 $2,400,000 * EVERETT <br /> 72 Local Access-NM 13 Snohomish River Bike and Ped '_*-.e Nov.01 Jan.16 $9,000,000 * EVERETT 48 <br /> 73 Local Access-NM 14 Pigeon Creek Road No.1 Im • e Apr.15 Jan.16 $1,000,000 * EVERETT 49 <br /> 74 Local Access-NM 15 Lowell Snohomish River• ke/Ped: nection May.15 Aug.16 Jan.17 $1,500,000 * EVERETT 50 <br /> 75 Local Access-NM 16 Everett Non-Motorized Proj-. * May.15 Aug.16 Jan.17 $760,000 * EVERETT <br /> 76 Local Access-NM 17 Riverfront District B' •at + Jul.09 Jan.16 $500,000 * EVERETT <br /> 77 Local Access-NM 18 Interurban Trail B''• Ped• r Im. -ments Jul.10 Jan.16 $500,000* EVERETT <br /> /8 Local Access-NM 19 Bicyle Detecti n ,nals Jan.15 Jan.16 $200,000* EVERETT <br /> 79 Local Access-NM 20 ADA Signa Jan.15 Jan.16 $200,000* EVERETT <br /> 80 Local Access-NM 21 ••;.Ra Jan.15 Jan.16 $200,000* EVERETT <br /> $57,980,000 <br /> NOTE: Projects shown i-, Id ty,,,: f any)were not included in the 2014-2019 Six-year TIP. <br /> *A portion or all of the fundin• r<, s project has not yet been committed. <br /> Codes: SAF=Safety; PR/M="`'"• ervation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement; <br /> NEI=Neighborhood Projects; LS=i, dscaping Project; NM=Non-Motorized Improvement <br />