My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3616 ROCKEFELLER AVE 2016-10-04
>
Address Records
>
ROCKEFELLER AVE
>
3616
>
3616 ROCKEFELLER AVE 2016-10-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 2:11:40 AM
Creation date
10/4/2016 2:16:57 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3616
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. For concrete installarions fasten aluminum post to concrete using (4} 318" x �" or lon�er concrete <br />anchors (anenors not prai�ided� <br />3. For wood �urface installat�on, install at least t�va 2"x 8" �5.1 cm x 20.3 cm) boards a.s blocking <br />under post location. Securei_y attach btocking using wood scretivs, penetratin� blocking a minimum <br />of 1-112„ (3.� cn�). <br />� <br />. _ _d <br />_ - 1 <br />4. Fasten aluminum post to decking using (4) 5/t6" x 4" or longer stainless steel la�s (lags not <br />provided). <br />Attaehin� Brackets: <br />1_ For both post to post and post to crossover post �onfiburations, attach bottorn bracket to post by <br />measuring 1 7/8" up from deck s�rface to bottom of bracket. Attach using 2 self-�appin� screws <br />(provided}. <br />2. For post ta post configuration, attach upper bracket by measurin� ug 32 �I8" (for 36" tall railing) <br />or 38 5/8" {for 42" tall railin�) from the upper af the bottom bracket to the tap of the upper <br />bracket. Keeping brackets centered on pos#, fasten to the post with 3 self-tapping screws <br />(prOvic�ed}. N07�: u��er hruck�et is na�t required�or crossover�ost confagurutian. <br />li�geasure, Cut, and Attach Bottam I�ailin�s — Post tu Post and Crossover Post Instat�a�ion: <br />1. Position bottam rail between posts anc� align with bottom bracket. Note that the center slot should <br />be in the middle of the span between posts. This will allow an equal number of baluster holes to be <br />on each side af the center slot. iViark rai] at each end while centered an�i cut to length by cutting <br />each end'/�" shorter than the mark to ailow for fit into the bottom rail brackets. Also cut the bottom <br />rail cover (flat cover} 3/4" shorter (1 1/2" overall) on each end than bottom rail length. <br />NOTE: If posts are in�alled at frcll sPan af 6' or S', boft�im rait and cnver ivill NOT need to be cu� <br />NOTE: When measuring bottom raiE, if there rs t�at enough cfearance for balusters on either side of post; offset <br />the cenfer slot until baluster spacing is at eyual dis�ance nn each sule of'PJae pos� IF 7'HI.S IS RE()UIRED, <br />ALSO ADJ�I.ST THE UPPER RAIL SO THE C�IVTER BALUSTER B�'ILL �3E VER'TICALLYALIGNED. <br />2. Attach the shorter, center baluster ta center sfot in bottom rail u�in� (2) #8 x 1'/4" screws <br />(provided�. <br />Pa�e3 <br />Figut�e abc�ve sh�nvin� cerrter balcrster atfachntent <br />(Not trtse r•epr•es�ntation c�f'bnluster heigltt; <br />REVEAL-1292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.