Laserfiche WebLink
I <br /> 4/4/2016 <br /> 2 <br /> 6. Detail 4 shows rigid insulation (R-Value not defined) on the interior of the <br /> foundation stem wall. R-21 insulation is required for that condition, R-21 will not fit into a <br /> 2x4 cavity. <br /> �'�� �'-�Z� <br /> The existing wall extension shows on detail 3/AD 1. The existing 2x4 <br /> wall become to 2x6 after install addition sister studs. So R-21 will be <br /> installed properly. <br /> 7. R-10 rigid insulation is required under the perimeter of a slab -on-grade when the <br /> slab is within 24" of the finished grade. <br /> The detail modified and 24" length of rigid insulation under existing <br /> slab provided <br /> 8. A minimum of 75% of permanently installed lamps in lighting fixtures shall be <br /> high-Efficacy lamps (R404.1 WSEC). Provide note on drawings. <br /> The note provided on sheet A04 <br /> 9. Section AA shows the exterior wall with studs extending from the new ceiling <br /> down to the slab-on-grade. Detail 4 shows the same studs stopping at the top of the <br /> concrete wall with wedge bolts that don't appear to be going through either of the 2x4 <br /> plates shown. <br /> Partial section A-A revised. <br /> 10. Detail 1 doesn't appear to occur anywhere on the drawings <br /> Typo con-ected <br /> 11. The floor plan shows a reference to detail 10 on sheet S1 that does not exist. <br /> Typo corrected <br /> 12. Note on drawings "all groundwork plumbing to be inspected before covering". <br /> The note provided on sheet A04 <br /> 13. R-4 pipe insulation is required on all hot water in conditioned and no conditioned <br /> spaces. Note on plans <br /> The note provided on sheet A04 <br /> 14. All additions to existing building that are less than 750 square feet <br /> of heated floor area shall specify 0.5 Credits for Additional energy <br /> archstudioyshadyrya2016 <br /> ��� <br />