Laserfiche WebLink
� <br />� <br />PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: 7/11 /2014 <br />Public Works Permit #: PW1407-017 <br />Building Permit #; S1406-004 <br />Planning Reference #: <br />Public Works Fee $: $ 40.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />EVERETT COMMUNITY COLLEGE <br />2000 TOWER ST <br />EVERETT Wq 98201 <br />PHONE: 4253889100 PHONE: <br />TAX PARCEL ID # 29051700201800 SITE ADDRESS: 2000 TOWER ST <br />DESCRIPTION OF PROPOSED WORK: <br />PW FOR NON LIT MONUMENT SIGN-EVCC <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 � <br />4. Locate utilities by locate service and discuss sign location with City of Everett inspector prior to beginning work <br />Your Public Works Inspector is Randy Allen. Call 425-339-7403 for any questions and/or inspections. <br />�"f / � <br />Ap ov or Constr io - Date <br />� � �a ._l� <br />INAL INS CTION Date <br />Approved as Constructed <br />�-�` <br />� :-: EL� I,�, , - , <br />.� � � r� (�J �� '' .;i <br />� tsOV 1 � "t.014 �� <br />� �.. <br />%1 � '. , � ��� i: <br />�"'V'� .tt-�,> `. _ Wice� <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public r pe � aged thereby. <br />� �f �� �'� <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFI-ER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />� l,'`i <br />