i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br /> placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Bid Item 17 - Temporary Pavement Patch I <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> One measurement for Temporary Pavement Patch shall be by the square yard placed <br /> within the limits of dimensions defined in the Work, descriptions for other bid items, shown <br /> on the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit price per square yard based on sawcut neatlines for temporary pavement patch <br /> using either cold mix asphalt (MC250), HMA CL 1/2" PG 64-22, or heavy duty steel plates <br /> shall be full compensation for all labor, material, tools and equipment, Work necessary to <br /> satisfactorily complete the Work as defined in the Standard Specifications, 5-06.3(6) of <br /> these Special Provisions and as shown on the Plans. <br /> The unit price for this bid item shall include all labor, hauling, compaction, HMA ramping of <br /> steel plates, materials, tools and equipment to furnish, place, compact and roll to conform <br /> to adjacent surfaces. Also specifically included in the unit price for this bid item are costs to <br /> maintain the temporary patch in such a manner to prevent traffic hazards until the <br /> permanent pavement surface, either HMA or Cement Concrete, has been installed and to <br /> remove and dispose of the temporary patch immediately prior to placing either the <br /> permanent HMA or Cement Concrete surface. <br /> Bid Item 18 - Ductile Iron Pipe For Water Main, 8-Inch Diam. <br /> Bid Item 19 - Ductile Iron Pipe For Water Main, 12-Inch Diam. I <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the <br /> vertical intersection of the centerline of the pipe measured with the centerline of the <br /> intersection pipe, or with the beginning or ending of any new linear length of valves or <br /> couplings contained within the measured length. At changes in pipe size connected by a <br /> reducer, the point of measurement shall be taken as the midpoint of the reducer. <br /> The unit contract price for Ductile Iron Pipe For Water Main, -Inch Diam., shall constitute <br /> full compensation for all labor, materials, tools and equipment necessary to furnish and <br /> install the pipe, restrained joints (where shown on the Plans or as required by the Standard <br /> Specifications and Special Provisions), and all fittings, including tees, crosses, reducers, <br /> couplings, and sleeves required for complete installation along the run of each pipe size, as <br /> shown on the Plans and specified herein, and additionally, shall include, but not be limited <br /> to, the following: <br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of the existing asphalt <br /> concrete pavement, sidewalk, curb, thrust blocks, miscellaneous landscaping, and sod <br /> as indicated on the Plans. <br /> 2. All required potholing to verify locations of water service crossings and existing utilities. <br /> The costs for pot-holing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no direct compensation <br /> made. I <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS July 8,2016 <br /> -Broadway <br /> WO No.—UP3612 SP-8 <br /> I <br />