My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> i. Detailed description (e.g., Motor Grader Diesel I <br /> Powered Caterpillar 12 "G", Tractor Crawler ROPS & <br /> Dozer Included Diesel, etc.) <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job overhead. <br /> v. Overhead (general and administrative). 1 <br /> vi. Subcontractor's Contract Claims (in the same level of <br /> detail as specified herein is required for any <br /> subcontractor's Contract Claims); and <br /> vii. Other categories as specified by the Contractor or the <br /> City. <br /> 10. A notarized statement shall be submitted to the City's Representative <br /> containing the following language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> I <br /> (name) (title) <br /> of ' <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and <br /> extension of Contract Time, if any. made herein for Work on this <br /> Contract is a true and complete statement of the factual basis of the <br /> Contract Claim and all actual costs incurred and time sought, and is <br /> fully documented and supported under the Contract between the <br /> parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public I <br /> My Commission Expires: <br /> 1-09.11(2)C False Or Omitted Information <br /> The Contractor waives each Contract Claim for which it presents material <br /> information that it knows, or in the exercise of reasonable care should know, is <br /> false, or omits or fails to disclose material information relating to such Contract <br /> Claim. In such case, Contractor shall reimburse the City for any and all fees and <br /> 111 <br /> expenses incurred in investigating any such Contract Claim. <br /> 1-09.11(3) Time Limitation and Jurisdiction <br /> (AAAAA*) <br /> The parties intend that all claims and Disputes be dealt with promptly and expeditiously <br /> when they arise. The parties intend that all claims and Disputes be resolved quickly <br /> and expeditiously and desire to avoid claims and Disputes that relate back to events or <br /> Work occurring months before. The parties desire to avoid litigation and the costs and <br /> expense of claims and Disputes at the end of the Project. <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -114 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.