Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 3. Documented, incurred cost of temporary facilities or equipment I <br /> rental extended because of the Delay; <br /> 4. Documented, incurred cost of insurance extended because of the <br /> Delay; I <br /> 5. General and administrative overhead in an amount to be agreed <br /> upon, but not to exceed three percent (3%) of original Contract Sum <br /> divided by the Contract Time for each day of the Delay. <br /> City shall not owe Contractor compensation for Extended Overhead or other <br /> delay costs to the extent Contractor or anyone other than the City contributed <br /> to or is concurrently responsible for the Delay. <br /> 1-09.11A(3)A2 Adjustment of Contract Time <br /> If the Contractor is entitled to an adjustment of Contract Time because of a <br /> Delay solely caused by the City that does not relate to Extra Work, Contractor <br /> shall be entitled to an adjustment of Contract Time to the extent the Delay <br /> increases the duration of the Project, as measured by the critical path and as <br /> demonstrated pursuant to the requirements of 1-08.8 EXTENSIONS OF <br /> TIME. 111 <br /> 1-09.11A(3)B Contractor Caused Delay <br /> If the Contractor is solely responsible for any Delay to any interim milestone, <br /> Substantial Completion, Physical Completion, or the Completion Date, the City <br /> shall be entitled to liquidated or other damages as provided elsewhere in the <br /> Contract Documents. The Contractor accepts the risk of any Delays caused by <br /> strikes, work slowdowns, job actions and labor unrest of any kind. Contractor <br /> shall not be entitled to any increase in Contract Sum or Contract Time due to a <br /> Delay it caused. <br /> 1-09.11A(3)C Delays Concurrently Caused by Contractor and Owner <br /> If the City and the Contractor cause a Delay concurrently, neither the City nor the <br /> Contractor shall be liable to the other except as provided herein. <br /> 1-09.11A(3)C1 Adjustment of Contract Sum <br /> The Contractor shall not be entitled to any adjustment in Contract Sum for <br /> Delays concurrently caused by the City and the Contractor. <br /> 1-09.11A(3)C2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for the City <br /> caused portion of any Delay concurrently caused by the City and Contractor <br /> to the extent the City caused the Delay to extend longer than if the Contractor <br /> had solely caused the Delay. <br /> 1-09.11A(3)D Third Party Caused Delays and Force Majeure <br /> 1-09.11A(3)D1 Caused Solely by Third Parties or Force Majeure <br /> 1-09.11A(3)D1a Adjustment of Contract Sum <br /> The City and the Contractor shall not be responsible to compensate each <br /> other financially for any Delay solely caused by a third party for whom <br /> neither the Contractor nor the City is responsible, or for any Delay <br /> caused solely by earthquake, flood, natural disasters, acts of war or acts <br /> of terrorism. A Delay caused by a utility's failure to provide service or <br /> relocate its lines (despite a timely request for such service or relocation) <br /> is an example of this kind of Delay for which neither the Contractor nor <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 1 <br /> -Broadway <br /> WO No.—UP3612 SP-116 <br /> I <br />