My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-10 TEMPORARY TRAFFIC CONTROL I <br /> 1-10.1 General <br /> 1-10.1(2) Description <br /> Supplement 1-10.1(2) as follows: <br /> Provide a uniformed off-duty Police Officer to control traffic for work at signalized <br /> intersections and other critical situations as determined by the Engineer. <br /> 1-10.2 Traffic Control Management <br /> 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the ' <br /> following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> supervisors by one of the organizations listed below: <br /> • Evergreen Safety Council (800) 521-0778 <br /> • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 , <br /> 1-10.2(2) Traffic Control Plans <br /> Supplement 1-10.2(2) as follows: <br /> Contractor may use City's Standard Traffic Control Plans included in COE <br /> Standard Drawings, Series 700. The City does not represent or warrant that the <br /> Standard Plans are sufficient, adequate or complete for the Contractor's means, <br /> methods or plan of Work. If a new or additional Traffic Control Plan is necessary, <br /> prepare detailed Traffic Control Plan complying with COE Standard Drawings, <br /> Series 700, the MUTCD, Part 6, and the most current edition of the PROWAG <br /> (Public Rights-of-Way Accessibility Guidelines). Plan preparation shall be at <br /> Contractor's sole cost and submitted to the City for approval at least 14 calendar <br /> days before starting Work. Work may not begin until Contractor is in receipt of <br /> City approved Traffic Control Plan. <br /> 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> (******) <br /> 1-10.3(1) General <br /> The Contractor shall provide all flaggers, signs and other traffic control devices. The I <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> from injury or damage as a result of the Contractor's operations that may occur on <br /> highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> all necessary signs and traffic control devices are in place. <br /> Flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington, Oregon, or Idaho. The flagging card shall be immediately available and <br /> shown upon request by the City. <br /> 1-10.3(2) Maintenance and Protection of Traffic Control <br /> 111 <br /> When the Bid Proposal includes an item for "Maintenance and Protection of Traffic <br /> Control", the Work required for this item shall include and not be limited to: <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -122 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.