My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> DIVISION 9 — MATERIALS <br /> 9-03 AGGREGATES <br /> Supplement Section 9-03 by adding the following: <br /> 9-03.22 Sand Backfill for Pipe Zone <br /> (***** <br /> ' For pipe zone bedding and backfill of steel pipe only, provide a clean sand mixture free <br /> from organic matter and conforming to the following gradation: <br /> U.S. Standard Percent Passing <br /> Sieve Size By Weight <br /> 1/2" 100 <br /> #4 65-100 <br /> #50 30-40 <br /> #200 0-8 <br /> All percentages are by weight. <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS <br /> 9-05.12 Polyvinyl Chloride (PVC) Pipe <br /> ' 9-05.12(1) Solid Wall PVC Culvert Pipe, Solid Wall PVC Storm Sewer Pipe, and <br /> Solid Wall PVC Sanitary Sewer Pipe <br /> Revise the third paragraph in 9-05.12(1) to read as follows: <br /> ' For pipe sizes 18 to 30-inch diameter, provide solid wall PVC pipe meeting ASTM <br /> F 679, using minimum pipe stiffness of PS46, unless otherwise noted on the <br /> Plans. <br /> ' Revise the fifth paragraph in 9-05.12(1) to read as follows: <br /> Provide Trench ToughTM SDR 35 gasketed injection molded fittings for solid wall <br /> PVC pipe as manufactured by MULTI FITTINGS, or equal. <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING <br /> 9-14.1 Soil <br /> ' Revise 9-14.1(1) to read as follows: <br /> 9-14.1(1) Topsoil Type A <br /> Provide imported, weed-free, topsoil mix, including amendments recommended in 9- <br /> 14.1(4), consisting of 1/3 sandy loam, 1/3 composted mulch, and 1/3 sand to produce <br /> an overall loamy sand textural class as determined by the U.S. Department of <br /> Agriculture Classification System. Provide topsoil from a commercial topsoil supplier <br /> ' who has been in the business for at least five consecutive years. <br /> Supplement 9-14.1 by adding the following: <br /> 9-14.1(4) Topsoil Testing and Amendments <br /> Provide two representative topsoil samples from each topsoil source to a certified soils <br /> laboratory for analysis. Soils laboratory will analyze samples and provide <br /> ' recommendations for adding amendments to topsoil and amount of lime, fertilizer, and <br /> micronutrients topsoil will require. All soils testing and inclusion of laboratory <br /> recommended amendments, lime and fertilizer to the topsoil shall be considered as <br /> incidental to the Work with no direct compensation made. <br /> Water Main Replacement"Q" Division 9-MATERIALS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.