My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BID SCHEDULE 1. <br /> BIDDER: 19er e if I C&Y <br /> Item <br /> eid <br /> ITEM DESCRIPTION Unit Q UNIT PRICE TOTAL AMOUNT <br /> Schedule A - Broadway (35th St to Pacific Ave) <br /> I1 Mobilization LS 1 $.2) ,(-K-. (D $ ) J,t.+ )2_ .1%23 <br /> I <br /> 2 Surveying LS 1 $25bA/2- $ 2-r 1'7- <br /> 3 <br /> 23 SPCC Plan LS 1 $ _.I $ Q2--i . Ic <br /> I4 Force Account FA 1 $ 10,000.00 $ 10,000.00 <br /> I <br /> 5 Traffic Control Labor HR 1000 $ Le .1.--'2- $ (j. 2--2 .00 <br /> 6 Traffic Control - Off-Duty Police Officer HR 70 $___(Q1 .21. $ 4 Ut .10 <br /> I7 Maintenance and Protection of Traffic Control LS 1 $1 2-( . (tb $ 111/2-1 ,(c <br /> I <br /> 8 Trench Excavation Safety Systems LS 1 $ ' t 1.010./)b $ 1'3,LPI G .'d30 <br /> 9 Street Cleaning & Sweeping HR 48 $ A 90 $c6)(6---(6 . <br /> I10 Erosion/Water Pollution Control FA 1 $ 1,000.00 $ 1,000.00 <br /> Sawcutting Asphalt Concrete Pavement, Final oQ <br /> IllJoint Cut up to 7-in LF 4400 $ ( S t` Dt+ <br /> Sawcutting Asphalt Concrete Pavement, Final �� <br /> 12 Joint Cut additional 1-in thickness LF 4400 $ 0 .�V $ , ' <br /> I Sawcutting Concrete Pavement, Final Joint Cut — <br /> 13 up to 7-in LF 4800 $ 4 .i)_ $ �.O(2)D+ bb <br /> Sawcutting Concrete Pavement, Final Joint CutI <br /> 14 additional 1-in thickness LF 4400 $ \ _. \I) $ 14 <br /> )q-1,2- .00 <br /> 15 Foundation Material, Class A or B TON 100 $ V 1 .( $ 1 l 1 ( <br /> I16 Gravel Borrow TON 1100 $ ( "F .110 $ (01.2 I .GO <br /> I <br /> I <br /> I <br /> Water Main Replacement "Q" Division P—PROPOSAL July 8, 2016 <br /> - Broadway <br /> WO No.—UP3612 SP— 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.