My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> ROAD <br /> I ONSTRUCTIONOAD <br /> AHEAD <br /> (W20-1) SEE NOTE 1 <br /> II <br /> NROAD <br /> ARROW <br /> S ' • � <br /> I (w5-1) <br /> SEE NOTE 1 I <br /> 1 <br /> � I <br /> I <br /> TAPER LENGTH O <br /> (TABLE A) <br /> i 0 i <br /> I WORK AREA <br /> TABLE A o rcl'ir- -r- <br /> , •�•,� <br /> TAPER LENGTH G i ,♦♦ ♦• <br /> CONE SPACING BUFFER � � <br /> SPEED FOR (�) SPACING �° o <br /> ►�� ��• <br /> (MPH) SHIFT WIDTH (Fr) <br /> 5' 6' TANGENT TAPER o ROLL SPACING <br /> °0 <br /> 25 26' 31' 25 55 (MIN 50' MAX 100') <br /> I 30 I 38' I 45' 30 85 <br /> 35 51' I 61' 1 35 20 120 <br /> ® ❑� <br /> 40 57' 80' ! 40 170 11 <br /> 45 1 1 3' 135' 45 I 220 M I N MIN m f TRUCK WITH <br /> I <br /> FLASHING OR �/ <br /> WITH <br /> NOTE: I BEACON n <br /> 1. DISTANCE BETWEEN SIGNS SHALL BE 100' ` <br /> FOR RESIDENTIAL STREETS (25 MPH), AND ❑° EE <br /> 350' FOR ARTERIAL ROADWAYS BUFFER SPACE <br /> 2. FLASHING BEACON SHALL BE INSTALLED AT .' O 0 (TABLE A) <br /> EACH SIGN FOR NIGHT-TIME USE j <br /> • (OPTIONAL). r K <br /> s , <br /> 3. DISTANCES MAY VARY AS APPROVED BY 1 0 . <br /> THE ENGINEER. \F TAPER LENGTH <br /> ( TABLE A <br /> - 4. FLAGGERS REQUIRED TO CONTROL TRAFFIC I i 1 (TABLE <br /> e <br /> WHENEVER THE CONTRACTOR MUST �� <br /> INTERRUPT TRAFFIC FLOW TO ACCESS THE <br /> .. WORK SITE WITH MATERIALS OR EQUIPMENT. K K <br /> I •• 5. FOR ALTERNATE LANE SHIFT WIDTH REFERR <br /> TO "MANUAL ON UNIFORM TRAFFIC SEE NOTE 1 <br /> CONTROL DEVICES" (MUTCD) TABLE 6C-2 I <br /> PAGE 6C-10 `• <br /> 1 " Ti----,�— <br /> 6. SIGN SIZE PER MUTCD. %(w1-4 L) <br /> I i SEE NOTE 1 <br /> - 7. THIS PLAN IS PROVIDED AS A GUIDE ONLY. ; <br /> FOR SPECIFIC INFORMATION ON TRAFFIC { ROAD <br /> I CONTROL PLANS SEE CURRENT MUTCD. ,, <br /> <ONSTRUCTION <br /> AHEAD <br /> r (w20-1) <br /> • <br /> LEGEND: I <br /> I 1 G CONE OR CHANNELIZING DEVICE <br /> (SEE STD 702) <br /> I ice, CITY OF EVERETT Traffic Control Plan 12-24-2003 <br /> • �� PUBLIC WORKS 2 Lane Roadway Partial Lane <br /> EVVRErr ENGINEERING & PUBLIC Closure 701 B <br /> SERVICES DEPARTMENT number <br /> ater Main Replacement"Q"-Broadway APPEND( A-COE STD DWGS July t3, 2U10 <br /> \A/C Nn I IID-R12 SP- 1P3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.