My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> WORK AREA ' E I <br /> AND TRUCK ' , I LEGEND: <br /> W/FLASHING i 1 I 1 - t <br /> BEACON i II `' ! © CONE OR CHANNELIZING DEVICE <br /> OR i I ` (SEE STD 702) i <br /> BOOM TRUCK # <br /> W/FLASHING ` [I <br /> YELLOW BEACON N. ROLL SPACE <br /> 1At3F 50'MIN 100'MAX <br /> Io <br /> j o <br /> KEEP o <br /> 1 <br /> I !MI a € RIGHT (W4-7A) ¢N111 <br /> a <br /> I <br /> -IH1 , i <br /> '-e.E E 200' �— <br /> 200' I I <br /> I -Ho ..„ <br /> •/ <br /> ROAD .---, Csl <br /> ',ONSTRUCTION <br /> AHEADt 01:.:R <br /> (W20-1) —f— <br /> ♦_ ❑e % <br /> I i <br /> NOTE: a <br /> (i`, E 75' MIN <br /> 1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR I. <br /> r RESIDENTIAL STREETS (25 MPH), AND 350' FOR U <br /> P. ARTERIAL ROADWAYS Ci <br /> it G TAPER LENGTH <br /> 2. FLASHING BEACON SHALL BE INSTALLED AT EACH E <br /> If p <br /> I ' (TABLE A) <br /> SIGN FOR NIGHT—TIME USE (OPTIONAL). <br /> 0o N • • <br /> 5 3. DISTANCES MAY VARY AS APPROVED BY THE IJ, Wmi , I <br /> ENGINEER. 1 1,I ( I <br /> A4. FLAGGERS REQUIRED TO CONTROL TRAFFIC • I; II i SEE NOTE 1 <br /> WHENEVER THE CONTRACTOR MUST INTERRUPT <br /> o TRAFFIC FLOW TO ACCESS THE WORK SITE WITH <br /> • MATERIALS OR EQUIPMENT. <br /> 6 5. SIGN SIZE PER MUTCD. ` \ (W4-2L) <br /> O 6. THIS PLAN IS PROVIDED AS A GUIDE ONLY. FOR r €I �f` � SEE NOTE 1 <br /> I <br /> i SPECIFIC INFORMATION ON TRAFFIC CONTROL PLANS 11 €; - <br /> • SEE CURRENT MUTCT I A <br /> N � . LEFT LANE <br /> m <br /> TAPER LENGTH I A ----i— AFHE D <br /> 11 <br /> SPEED (FT) CONE SPACING j 1 ._ (w20-5L) <br /> J (MPH) ALONG TAPER ? I @ <br /> OFFSET WIDTH I SEE NOTE 1 <br /> LL 10' 12' (Er) !) I I <br /> rn 25 105 125 25 I i) l ROAD <br /> 30 150 180 30 -� <br /> o I' i ' i I^ ONSTRUCTION <br /> 0 35 205 245 35 AHEAD <br /> 40 270 320 40 ' (w20 1) <br /> o I i, <br /> 1 45 450 540 45 , <br /> i <br /> ;:''-%p CITY OF EVERETT TRAFFIC CONTROL PLAN - - 1 <br /> N �� 12 d 4 2003 <br /> w �� PUBLIC WORKS 5 LANE ROADWAY WITH LEFT TURN <br /> • <br /> EVERETT ENGINEERING & PUBLIC CLOSURE FAR SIDE OF 701 G <br /> SERVICES DEPARTMENT INTERSECTION number <br /> ater Main Replacement"0"-Broadway APPENDIX A-COE STD DVUGS July 8, 2Ulb <br />
The URL can be used to link to this page
Your browser does not support the video tag.