My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SAWCUT <br /> / (TYP) <br /> Q <br /> 5 <br /> L � , ' <br /> Nyima �— ZI <br /> mix N r DETAIL B <br /> N �. O © N <br /> C Q 4 Cl- < <br /> —r "� <br /> 16 . - <br /> SECTION A-A SECTION B-B SAWCUT TO <br /> J-BOX <br /> DETAIL C <br /> ® INSTALLATION NOTES: <br /> 1. SEALANT - CRAFCO PART NO 34271, OR APPROVED EQUAL. i <br /> 2. LOOP WIRE - NUMBER VARIES SEE LOOP WINDING DETAILS BELOW. <br /> 3. LEAD-IN WIRES: ONE PAIR FOR EACH LOOP SERVED, 3 PAIR MAX PER SAWCUT SEE INSTALLATION NOTES. 11 <br /> 4. EXTEND SAWCUT SUFFICIENT LENGTH TO PROVIDE FULL SAWCUT DEPTH AROUND CORNERS. <br /> 5. LOCATE CORNER SAWCUT AT 45' TO SIDE CUTS TO PREVENT KINK IN LOOP WIRE AND ALSO MINIMIZE VOID. TRIANGULAR <br /> VOID WILL BE REMOVED AND FILLED WITH SEALANT. <br /> GENERAL NOTES FOR LOOP INSTALLATION: <br /> 1. INSTALL JUNCTION BOX AND LEAD-IN CONDUIT. I <br /> 2. SAW LOOP SLOTS AND LEAD-IN SLOTS. <br /> 3. LAY OUT LOOP WIRE BEGINNING AT JUNCTION BOX, ALLOWING 5' MINIMUM SLACK. I <br /> 4. INSTALL WIRE IN LOOP SLOT. SEE LOOP WINDING DETAIL. <br /> 5. RETURN TO JUNCTION BOX AND IDENTIFY LEADS WITH PLAN DETECTOR NUMBER AND "S" FOR START AND "F" FOR FINISH. <br /> 6. TWIST EACH PAIR OF LEAD-IN WIRES TWO TURNS PER FOOT FROM LOOP TO JUNCTION BOX AND INSTALL IN LEAD-IN <br /> SLOT AND CONDUIT. REVERSE DIRECTION OF TWIST FOR EACH SUCCESSIVE PAIR INSTALLED. <br /> 7. CONSTRUCT SUPPLEMENTAL SPLICE CONTAINING ANY SERIES OR PARALLEL LOOP CONNECTIONS REQUIRED IN PLANS. <br /> SUPPLEMENTAL SPLICES ARE SUBJECT TO THE SAME REQUIREMENTS SHOWN FOR THE LOOP LEAD AND SHIELDED CABLE <br /> SPLICE. IF APPROVED BY ENGINEER SCOTCHLOK 3570 EPDXY KIT SEALING PACKS MAY BE SUBSTITUTED FOR THE <br /> SCOTCHCAST 82-B1 FOR SUPPLEMENTAL SPLICES. <br /> 8. SPLICE LOOP LEADS OR SUPPLEMENTAL SPLICE LEADS TO SHIELDED CABLE AS NOTED. <br /> 9. COMPLETE INSTALLATION AND TEST LOOP CIRCUITS OR COMBINATION LOOP CIRCUITS. SEE WSDOT STD SPEC 8-20.3(14)0. <br /> 10. FOR LOOP LOCATION REFER TO STD DWG 802 AND PLANS. <br /> 11. SEAL ENDS OF CONDUIT WITH ELECTRICAL PUTTY OR SILICONE. <br /> 12. DRILL HOLE FOR HOME-RUN CONDUIT 1" LARGER THAN CONDUIT AND FILL VOID WITH HOT MIX ASPHALT. <br /> 13. ALL SPLICES SHALL BE ABLE TO BE RAISED A MINIMUM OF 16" ABOVE GROUND LINE. I <br /> 14. BUCHANAN 2006S SPLICE CAPS, CRIMP WITH BUCHANAN C-24 CRIMPER FOLLOWING MANUFACTURER'S INSTALLATION <br /> PROCEDURE. SOLDER CRIMP (NO OPEN FLAME TORCH OR SIMILAR IS ALLOWED) AND TAPE WITH 2 LAYERS OF TAPE. <br /> TRAFFIC INDUCTION LOOP 1-12-2014 1 <br /> , CITY OF EVERETT pte. <br /> JETT <br /> PUBLIC � DETAILS g06 <br /> DEPARTMENT (SHEET 3 OF 3) I <br /> COE Std Dwo: <br /> Water Main Replacement"0"-Broadway APPENDI A-COE STD DWGS July d, 2U10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.