My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS FOR <br /> WATER MAIN REPLACEMENT "Q" - BROADWAY <br /> WO NO. - UP3612 <br /> NOTICE TO CONTRACTORS <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the WATER MAIN REPLACEMENT "Q" - BROADWAY will be <br /> received at the office of the City Clerk, 1st Floor Wall Street Building, 2930 Wetmore, Everett, Washington <br /> 98201. until 2:00 p.m. on Tuesday, August 2. 2016. At the appointed time, all bids will be opened and publicly <br /> read aloud in the 8th floor hearing room at the Wall Street Building. The engineer's estimate for this Project <br /> is $719.300. <br /> Work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to <br /> construct approximately 1,900 linear feet of 12-in ductile iron pipe and other such appurtenances and <br /> performing all Work as required by the Contract, in accordance with the Contract Plans and Contract Provisions. <br /> Plans, Specifications, Addenda, and plan holders list for this Project may be viewed on line <br /> at https://everettwa.gov/3 19/Bid-Opportunities. <br /> Plan sets may also be purchased at Bill's Blueprints (425) 259-0859 at 2920 Rockefeller Avenue, Everett, WA <br /> 98201. <br /> For technical questions regarding this Project email Richard Hefti P.E., Project Manager, City of Everett, <br /> at rhefti(a�everettwa.gov. <br /> All bids must be made upon the regular forms provided for this purpose and must be accompanied by a bid <br /> bond or certified check in an amount not less than five percent (5%) of the total amount of the Bid. <br /> The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No Bidder <br /> may withdraw his Bid after the hour set for the opening thereof. The City further reserves the right to make the <br /> bid award as deemed in the best interest of the City. The right is reserved by the City to postpone the award for <br /> a period of forty-five (45) days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining to <br /> equal employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Dated at Everett, Washington. <br /> SHARON FULLER, CITY CLERK <br /> 1I <br /> Water Main Replacement"Q" ADVERTISEMENT FOR BIDS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.