My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> After Award of the Contract, the Contractor will receive up to six (6) sets of the reduced <br /> Plans (11" x 17") and accompanying Special Provisions. In addition, the Owner will <br /> supply up to three (3) sets of full size plans (22" x 34"). All Plans and Special <br /> Provisions will be conformed with addenda unless Contractor requests otherwise. <br /> Additional Plans and Special Provisions may be purchased by payment of the current <br /> printing costs. <br /> 1-02.4 Examination of Plans, Specifications, and Site of Work <br /> 1-02.4(1) General <br /> Delete the fifth paragraph of 1-02.4(1), beginning with "Bid prices shall reflect", and <br /> substitute the following: <br /> Bid prices shall include everything necessary for the completion of the Work <br /> including, but not limited to, providing the materials, equipment, tools, plant and <br /> other facilities, and the management, superintendence, labor, and all necessary <br /> testing services. <br /> Supplement 1-02.4(1) by adding the following: <br /> Bidder acknowledges that he/she has not relied on representation or warranty of <br /> the City not expressly included in the Contract Documents. <br /> The information provided by the City is not intended to be a substitute for, or a <br /> supplement to, the independent verification by the Bidder to the extent such <br /> independent investigation of the Drawings and Specifications or Site conditions is <br /> deemed necessary or desirable by the Bidder. Bidder acknowledges that they <br /> have not relied upon City or Engineer furnished information regarding site <br /> 1 conditions in preparing and submitting a Bid. <br /> Further supplement 1-02.4(1) by adding the following: <br /> 1-02.4(1)A Interpretation of Contract Documents <br /> (******) <br /> Should a Bidder find what is believed to be discrepancies in or omissions from the <br /> Plans, Specifications, or Special Provisions, or should the Bidder be in doubt as to <br /> their meaning, Bidder may submit to the Engineer a written request for an <br /> interpretation thereof. The Bidder submitting the request will be responsible for its <br /> prompt delivery. Any interpretation of the documents, if made, will be made only <br /> by addendum duly issued and a copy of such addendum will be mailed or <br /> delivered to each Bidder receiving a set of such documents. All requests for <br /> interpretations must be received by the City or Engineer no later than 7 <br /> calendar days prior to the Proposal opening date. All questions regarding the <br /> Contract Documents shall be referred to the City or Engineer at the address <br /> provided in the Contract Documents. <br /> 1-02.4(1)B Prevailing Wages <br /> (******) <br /> Bidder is directed to 1-07.9(1) of these Special Provisions for requirements <br /> regarding applying payment of prevailing wage rates for employment of labor on <br /> within Snohomish County. <br /> 1-02.5 Proposal Form <br /> Delete the first paragraph of 1-02.5 and substitute the following: <br /> Bidder shall submit Bidder's Proposal on the Proposal Form provided in the Contract <br /> Documents. <br /> Water Main Replacement"Q" Division 1 -GENERAL CONDITIONS July 8, 2016 <br /> Broadway <br /> WO No.-UP3612 SP -41 <br /> 1 <br />