My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS 111 <br /> Proposals. Email, fax or telephone requests to withdraw, revise, or supplement a <br /> Proposal are not acceptable. <br /> Resubmitted Proposals shall be in full compliance with the bidding requirements. Bid <br /> deposit shall be in an amount sufficient for the Proposal as resubmitted. <br /> After the scheduled time for opening Proposals, no Bidder will be permitted to withdraw <br /> his Proposal unless the award of contract is delayed for a period exceeding 45 <br /> calendar days. Proposals received after the scheduled closing for opening Proposals <br /> will be returned unopened to the Bidder. 111 <br /> 1-02.12 Public Opening of Proposals <br /> Supplement 1-02.12 by adding the following: <br /> 1-02.12(1) Postponement of Opening <br /> (******) <br /> The City reserves the right to postpone the date and time for receiving or opening of I <br /> Bids, or both, at any time prior to the date and time established in the Notice to <br /> Bidders. Postponement notices shall be provided to Bidders in the form of addenda. <br /> 1-02.13 Irregular Proposals I <br /> Revise item 1 of 1-02.13 to read as follows: <br /> 1. A Proposal will be considered irregular and may be rejected if: <br /> a. The Bidder is not prequalified when so required; 111 <br /> b. The authorized proposal form furnished by the City is not used or is altered; <br /> c. The completed proposal form contains any unauthorized additions, deletions, <br /> alternate Bids, or conditions; <br /> d. The Bidder adds provisions reserving the right to reject or accept the Award, or <br /> enter into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> applicable, as required in 1-02.6; <br /> h. The Bidder fails to submit or properly complete a Disadvantaged, Minority or <br /> Women's Business Enterprise Certification, as required in 1-02.6; <br /> i. The Bid Proposal does not constitute a definite and unqualified offer to meet the <br /> material terms of the Bid invitation; or <br /> j. More than one proposal is submitted for the same project from a Bidder under <br /> the same or different names. <br /> 2. A Proposal may be considered irregular and may be rejected if: <br /> a. The Proposal does not include a unit price for every Bid item; <br /> b. Any of the unit prices are excessively unbalanced (either above or below the <br /> amount of a reasonable Bid) to the potential detriment of the Contracting <br /> Agency; <br /> c. Receipt of Addenda is not acknowledged; <br /> d. A member of a joint venture or partnership and the joint venture or partnership <br /> submit Proposals for the same project (in such an instance, both Bids may be <br /> rejected); or <br /> e. If Proposal form entries are not made in ink. <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -44 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.