My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> • Certificate of Insurance and additional insured endorsement in accordance <br /> with 1-07.18 "Insurance" of the Special Provisions. <br /> Revise the third paragraph of 1-03.3 to read as follows: <br /> 1 If the Bidder experiences circumstances beyond their control that prevents return of <br /> the Contract Documents within 14-calendar days after the Award Date, the City may <br /> grant more time for return of the documents, provided the City deems the <br /> circumstances warrant it. <br /> Supplement 1-03.3 by adding the following: <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1-03.4 Contract Bond <br /> Revise 1-03.4 to read as follows: <br /> The Contractor shall provide a separate payment bond and performance bond, each in <br /> the amount of 100 percent of the Contract Sum and each in the form contained in the <br /> Contract Documents. These bonds shall serve as security for the faithful performance <br /> of the Work and as security for the faithful payment and satisfaction of the persons <br /> furnishing materials and performing labor on the Work. The bonds shall be issued by a <br /> corporation duly and legally licensed to transact surety business in the State of <br /> Washington. Such bonds shall remain in force throughout the period required to <br /> complete the Work, and thereafter for a period of three hundred sixty-five (365) <br /> calendar days after Final Acceptance. The bonds must be executed by a duly licensed <br /> surety company, which is listed in the latest Circular 570 of the United States Treasury <br /> Department. as being acceptable as surety on federal bonds. No surety's liability on <br /> the bond shall exceed the underwriting limitations for the respective surety specified in <br /> Circular 570. The bonds must be signed by an officer of the Contractor empowered to <br /> sign binding instruments. The bonds must be accompanied by a fully executed and <br /> original power of attorney for the officer executing on behalf of the surety. The scope <br /> of the bonds or the form thereof prescribed in these Contract Documents shall in no <br /> way affect or alter the liabilities of the Contractor to the Owner as set forth in the <br /> Contract Documents. <br /> 111 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit <br /> Supplement 1-03.6 by adding the following: <br /> ' Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br /> accompanying the Bids that are not to be considered in making the Award. <br /> 1-03,7 Judicial Review <br /> Revise the first paragraph of 1-03.7 to read as follows: <br /> All protests by Bidders must be in accordance with Chapter 3.46 of the Everett <br /> Municipal Code, "Bid Protest Procedures." <br /> The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> Water Main Replacement"0" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-47 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.