My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> In all disputes concerning accuracy of lines and elevations, the City shall be assumed <br /> correct and the Contractor shall correct the discrepancies before construction work <br /> may proceed. No additional compensation will be paid for this corrective Work. <br /> Payment: The lump sum contract price for "Surveying" shall be full pay for all costs <br /> involved in furnishing all labor, tools, survey instruments, materials, and other <br /> equipment necessary for the setting and maintaining of the alignment and grade as <br /> specified. <br /> 1 1-05.6 Inspection of Work and Materials <br /> Supplement 1-05.6 by adding the following: <br /> 1-05.6(1) Demonstration of Compliance with Contract Requirements <br /> (******) <br /> The burden of proving the constructed Work complies with the Contract Documents <br /> shall be on the Contractor at all times. The Contractor shall grant the City's <br /> Representative access to the Work and work site and to places where Work is being <br /> prepared, or where materials, Equipment, or machinery are being obtained for the <br /> Work. The Contractor shall provide information requested by the City's Representative <br /> in connection with inspection work. <br /> If the Contract Documents, laws, ordinances. or public regulatory authority requires <br /> parts of the Work to be specially inspected, tested, or approved, the Contractor shall <br /> give the City's Representative be not less than two working days prior written Notice of <br /> the availability of the subject Work for examination. <br /> Inspection and quality control tests performed on the Contractor's work by the City's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> quality therein and shall not be regarded..as an assumption of risks or liability by the <br /> City's Representative for the Contractor's compliance with these Contract Documents. <br /> Contractor remains responsible and liable for all errors, defects or a lack of quality not <br /> discovered by inspection or observation. <br /> 1-05.6(2) Manufacturer's Directions <br /> (****-Al <br /> Manufactured articles, material and Equipment shall be transported, stored, applied, <br /> installed, connected, erected, adjusted, tested, operated and maintained as <br /> recommended by the manufacturer, unless otherwise specified in these Special <br /> I Provisions. Provide manufacturer's installation instructions and procedures to the City <br /> prior to installation of the manufactured articles, material and Equipment. <br /> �j1-05.6(3) Materials and Equipment Furnished by City <br /> . (******) <br /> Contractor shall install materials and Equipment furnished by the City as provided in <br /> the technical sections of the Specifications. Furnishing of material and Equipment by <br /> the City will be considered conclusive evidence of their acceptability for the purpose <br /> intended. If the Contractor discovers defects in material or Equipment furnished by the <br /> City, it shall immediately notify the City. After such discovery, the Contractor shall not <br /> proceed with Work involving City-furnished materials and Equipment unless authorized <br /> by the City. Unless otherwise noted or specifically stated, materials and Equipment <br /> furnished by the City, that are not of local occurrence or manufacture, are considered <br /> to be "FOB" railroad station or truck terminal nearest to the site of the Work. At no cost <br /> to the City, the Contractor shall unload, transport, store, and protect such material and <br /> Equipment from damage. The Contractor shall inspect such City-furnished material <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-59 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.