Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-07.17 Utilities and Similar Facilities I <br /> Supplement 1-07.17 by adding the following: <br /> The Contractor shall review its responsibilities under Chapter 19.122 RCW, a law <br /> relating to underground utilities. Cost to the Contractor incurred as a result of <br /> complying with this law shall be at the Contractor's expense. In accordance with RCW <br /> 19.122, the Contractor shall call the Utility Coordinating Council One Call Center, 1- <br /> 800-424-5555, for field location, not less than 2 nor more than 10 business days before <br /> the scheduled date for commencement of excavation that may affect underground <br /> utility facilities, unless otherwise agreed upon by the parties involved. A business day <br /> is defined as any day other than Saturday, Sunday, or a legal local, State, or Federal <br /> holiday. <br /> The Contractor shall be responsible for determining the exact location, including <br /> service connections, of all public and private underground utilities marked at the site of <br /> the Work. Perform field verification prior to beginning Work that could result in damage <br /> to buried utilities, including but not limited to exploratory excavations, in sufficient time <br /> so as not to impede the progress of the Work or fabrication of materials to be <br /> incorporated into the Work. The Contractor shall immediately notify the City's <br /> Representative as to any utility discovered by him in a different position than shown on <br /> the Plans or that is not shown on the Plans. <br /> No excavation shall begin until all known underground public and private utilities in the <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of <br /> the City to show the existence of subsurface objects or installation on the Plans shall <br /> not relieve the Contractor from its responsibility to make an independent check on the <br /> ground, nor relieve Contractor from all liability for damages resulting from its <br /> operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the <br /> agencies that have utilities in place and to coordinate with these agencies in the <br /> protection and relocation of the various underground installations. These agencies will <br /> give assistance in the location of the various utilities, but this shall not relieve the <br /> Contractor from responsibility for any damage incurred. The City shall require a <br /> notification of at least five working days. The Contractor shall hold the City harmless <br /> against any claim of any nature resulting from Delays in attending to same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience: <br /> Snohomish County PUD #1 Puget Sound Energy <br /> P.O. Box 1107 P.O. Box 97034 BOT-01G <br /> Everett, Washington 98206 Bellevue, WA 98009-9734 <br /> Attn: Erin Burke Attn: Lisa Griffith <br /> Tel. (425) 783-4745 Tel. (425) 424-6472 <br /> Email: EFBurke@SNOPUD.com Email: lisa.griffith@pse.com <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> - Broadway <br /> WO No.—UP3612 SP -78 <br />