My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Each property owner shall be given 48 hours notice prior to entry by the Contractor. <br /> This includes entry onto easements and private property where private improvements <br /> must be adjusted. <br /> The Contractor shall be responsible for providing, without expense or liability to the <br /> City, any additional land and access thereto that the Contractor may desire for <br /> temporary construction facilities, storage of materials; or other Contractor needs. <br /> However, before using any private property, whether adjoining the Work or not. the <br /> Contractor shall file with the Engineer a written permission of the private property <br /> owner, and, upon vacating the premises, a written release from the property owner of <br /> each property disturbed or otherwise interfered with by reasons of construction <br /> pursued under this Contract. The statement shall be signed by the private property <br /> owner, or proper authority acting for the owner of the private property affected. stating <br /> that permission has been granted to use the property and all necessary permits have <br /> been obtained or, in the case of a release, that the restoration of the property has been <br /> satisfactorily accomplished. The statement shall include the parcel number, address, <br /> and date of signature. Written releases shall be filed with the Engineer before the <br /> Completion Date will be established. <br /> 1-07.27 No Waiver of State's Legal Rights <br /> Delete 1-07.27 and substitute the following: <br /> 1-07.27 No Waiver of City's Legal Rights <br /> (******) <br /> The City shall not be precluded or estopped by any measurement, estimate. or certificate <br /> made either before or after the completion and acceptance of the Work and payment <br /> therefor from showing the true amount and character of the Work performed and materials <br /> furnished by the Contractor, or from showing that any such measurement, estimate, or <br /> certificate is untrue or incorrectly made, or that the Work or materials do not conform in fact <br /> to the Contract. The City shall not be precluded or estopped, notwithstanding any such <br /> measurement, estimate, or certificate, and payment in accordance therewith, from <br /> recovering from the Contractor and the Sureties such damages as it may sustain by reason <br /> of the Contractor's failure to comply with the terms of the Contract. Neither the acceptance <br /> by the Engineer nor any payment for the whole or any part of the Work, nor any extension <br /> of time, nor any possession taken by the City shall operate as a waiver of any portion of the <br /> Contract or of any power herein reserved or any right to damages herein provided, or bar <br /> recovery of any money wrongfully or erroneously paid to the Contractor. A waiver of any <br /> breach of the Contract shall not be held to be a waiver of any other or subsequent breach. <br /> The Contractor and the City recognize that the impact of overcharges to the City by the <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore; the <br /> Contractor agrees to assign to the City all claims for such overcharges. <br /> 1-08 PROSECUTION AND PROGRESS <br /> Supplement Section 1-08 by adding the following: <br /> 1-08.0 Preliminary Matters i <br /> 1-08.0(1) Preconstruction Conference <br /> Prior to the Contractor beginning the Work, a preconstruction conference will be held <br /> between the Contractor, the Engineer and such other interested parties as may be <br /> invited. The purpose of the preconstruction conference will be: <br /> 1. To review the initial progress schedule; <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-86 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.