My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-08.3(3) Schedule Format And Content <br /> 1-08.3(3)A Schedule Format <br /> All schedules shall be in the following form: I <br /> 1. Network analysis system using the current version of Microsoft Project <br /> software and the critical path method, as outlined in The Associated <br /> General Contractors of America (AGC) publication "The Use of CPM in <br /> Construction -A Manual for General Contractors." <br /> 2. Sequence of Listings: The chronological order of the start of each activity <br /> of Work. Listings on Progress Schedule and Schedule of Values shall be <br /> the same. <br /> 3. Scale and Spacing: To provide space for notations and revisions. <br /> 4. Each schedule and update shall be provided in three (3) paper copies <br /> and three (3) electronic copies in current Microsoft Project 2007 format. <br /> Paper copies shall be on a single sheet of paper and of sufficient size to <br /> allow legibility of schedule. Pieces of the schedule on separate sheets of <br /> paper that must be taped together to form schedule are not permitted. <br /> Electronic copies shall be submitted on either separate CD-ROMs or as <br /> email attachment to City's Representative. <br /> 5. Updated Progress Schedules shall indicate progress of the Work to the <br /> date of submission by drawing a vertical line down the schedule to <br /> represent Work completed to date. <br /> 1-08.3(3)B Schedule Contents <br /> All Progress Schedules shall: <br /> 1. Include essential sub-schedules of related activities. <br /> 2. Allow for timely incorporation of any other's work under separate contract <br /> with City. <br /> 3. Allow for timely incorporation of work provided and installed by City. <br /> 4. Include submittals to agencies required for performance of Work with <br /> sufficient, adequate and reasonable time for review, comment and return <br /> submittals. <br /> 5. Allow for appropriate durations to complete activities that may be <br /> affected by weather during the time of year the activities are performed. <br /> 6. Identify logical connections, dependency upon preceding or succeeding <br /> activities, restraints or constraints, planned start and completion dates, <br /> duration, actual start and completion dates, and variances. <br /> 7. Activity durations shall not exceed twenty (20) days. The activities shall <br /> be related to early and late start, early and late finish, and Float dates. <br /> Activities listed in the Preliminary Schedule shall be included in all subsequent <br /> schedules. No activity in the Preliminary Schedule shall be deleted without prior <br /> written consent of the Representative and City. <br /> Contractor shall notify City's Representative and City in writing and highlight the <br /> addition of all activities to the schedule after the Preliminary Schedule. <br /> The Baseline Schedule shall be part of the Contract. <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-92 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.