Laserfiche WebLink
i <br /> -7 INSPECTION REPORT <br /> Date I I I 6 I�. Permit: elj3y 4 ��I <br /> Contractor: e(a <br /> Owner: <br /> Site Address: � st <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> Ds er . ❑Framing E]Rooftop Units E]Water Service <br /> ounding F]insulation E]Mechanical Final ❑Medical Gas <br /> Ceill Grid Drywall Nailing E]Plumbing Final <br /> Electrical Final Shear Nailing GAS PIPE <br /> TTTSITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final � E]Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:_ UJ_O -3938 <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspecto Date: <br /> EIR(10/06) DATABAR,INC. <br />