My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants LLC Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 10:48:46 AM
Creation date
10/19/2016 10:48:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
10/4/2016
Council Approval Date
9/28/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulator 4 and 39 modifications
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$356,897.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 26,2016 <br /> HWA Project No. 2016-P101-21 <br /> laboratory test results. The report will provide a narrative and geotechnical <br /> recommendations for each of the above described geotechnical aspects of the project. <br /> • Project Coordination Meeting: HWA will attend up to one (1)project coordination <br /> meeting at the City of Everett Office. This meeting will be to convey the geotechnical <br /> considerations of the site to the City and the design team. <br /> • 60 Percent Plan Review: HWA will conduct a plan review at the 60 percent milestone <br /> to insure that the geotechnical aspects of the project have been properly incorporated into <br /> the project plans. <br /> Assumptions: <br /> • The CITY will obtain permission to access the proposed areas within the WSDOT right <br /> of way. <br /> • Any required street use, and other permit fees will be paid by others. <br /> • No analytical testing will be conducted to identify potential soil contamination. <br /> • Groundwater monitoring well abandonment will be completed by the contractor during <br /> construction and not as part of the design phase of this project. <br /> • Non-contaminated drilling spoils will be collected and disposed of offsite by the driller. <br /> If soil contamination is identified, drilling spoils will be drummed and left within the <br /> grassy area until such time as analytical testigg is completed to determine an appropriate <br /> disposal site. Coordination associated with contaminated spoil removal, if required, is <br /> not included in this scope and budget. <br /> • All drilling will be completed during the weekday daylight hours between 7AM and <br /> 6 PM. <br /> Deliverables: <br /> • Geotechnical Exploration Memorandum <br /> • Draft and final geotechnical report <br /> COST ESTIMATE <br /> Based on our understanding of the project and assumed site conditions,we propose to provide <br /> the above geotechnical engineering scope of services on a time and materials basis not to exceed <br /> $38,723. However, if during the project unexpected conditions are revealed that require <br /> alteration of our work scope, or the Client or Owner request analyses and evaluations which <br /> would require a level of effort beyond the scope of our proposed study and budget, we will <br /> contact you immediately to discuss any necessary modifications to oui scope of services and/or <br /> budget estimate. A summary of our estimated costs are presented on the attached spreadsheet. <br /> Snohomish River Overflow Structure R4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.