Laserfiche WebLink
4. <br />, <br />5. <br />6. <br />7. <br />8. <br />�� <br />10. <br />• � <br />PUBLIC WORKS PERMIT COMMENTS <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for this lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. <br />Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />�=�--<_ <br />11..'i Install erosion control measures per City of Everett Standards for small parcels <br />�� <br />12. <br />13. <br />14 <br />15. <br />16. <br />17. <br />18. <br />19.7 ' <br />20. <br />21 <br />22 <br />23. <br />Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allowed on this building lot. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br />pedestrian travel. <br />Adjust water meter box 1" above sidewalk grade. <br />Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. ali unused driveways and any <br />broken or damaged area must be replaced). <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />Contact the <br />sewer services. <br />Water District for connecting provisions for this building's water and <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br />13D. <br />FOR PUBLIC WORKS INSPECTION, CALL RANDY AT 425-339-7403 / CLIFF AT 425-339-7404 <br />PWComments <br />:� <br />