Laserfiche WebLink
Hi Kirk— <br /> I have the following comments on this project: <br /> In order to meet stormwater management requirements for this project, the Boeing Company will <br /> contract with the Snohomish County Airport—Paine Field (Airport) to provide storm water detention in <br /> the Airport's Alpha regional detention facility(Alpha Pond). Stormwater treatment will occur, in <br /> accordance with the Airport's requirements, prior to discharge to the Alpha Pond. Therefore, <br /> Snohomish County will be responsible for the review and approval of the stormwater treatment and <br /> flow control facilities and design documents for this project. However,other storm water facilities on <br /> the site—such as conveyance systems—will be designed and constructed in accordance with City <br /> standards. <br /> Thank you, <br /> Jane <br /> Jane Zimmerman, Sr. Engineer <br /> City of Everett Public Works Department <br /> phone: 425-257-8885 fax: 425-257-8882 <br /> e-mail:izimmerman(i�everettwa.gov <br /> ae <br /> z � <br /> .97�� <br />