My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-12 2016-10-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:18:20 AM
Creation date
10/20/2016 11:07:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: McGuire, Peter D fmailto:peter.d.mcguire(Qbboeing.com] <br /> Sent: Monday, May 04, 2015 10:55 AM <br /> To: Jane Zimmerman <br /> Cc: Paul McKee; O'Neill, Jan (Jan.O'Neill@co.snohomish.wa.us); Dolan, Bill; John Jimerson <br /> Subject: Detention of Stormwater For Boeing's New Flightline Hangar <br /> Hi Jane— <br /> Paine Field Airport has agreed to accept the un-detained flow of stormwater from the New Flightline Hangar project site <br /> to their Alpha Pond. Treatment will be provided on the project site before entering the Alpha Pond. <br /> Would an email from Bill Dolan, Deputy Direct of Paine Field Airport, stating that they will accept the un-detained flow <br /> of stormwater satisfy your"detention" review? <br /> Thanks, <br /> Pew Mc-Gwi r& <br /> Pete McGuire <br /> The Boeing Company <br /> Land Use and Civic Affairs <br /> Phone:425-238-3768 <br /> Fax (425)266-8105 <br /> From: Jane Zimmerman [mailto:JZimmerman@everettwa.clov] <br /> Sent: Thursday, October 09, 2014 6:47 AM <br /> To: McGuire, Peter D <br /> Cc: Gomez, Martin H; Larmay, Russell T; Sugino, Alan K; Dave Tyler; Paul McKee <br /> Subject: RE: Pre-Application Meeting For new Flightline Hangar <br /> Hi Pete— <br /> To answer your question "... if the stormwater will be detained in Paine Field's Alpha Pond, ...what will your involvement <br /> be in the review process?": <br /> I would still need to review and approve the construction drawings for the Static Test facility because that project is <br /> within the City of Everett. And as long as the static test facility doesn't discharge to Lake Boeing (or another wetland <br /> regulated by the City) before entering the Alpha pond, a letter from Snohomish County that"officially" accepts un- <br /> detained flow to their Alpha pond would suffice for my"detention" review. If the Alpha pond was also designed and/or <br /> modified to provide treatment of the runoff from the Static Test facility, and the County also officially accepted un- <br /> treated runoff from the facility,then you could also bypass me for that aspect of the review too! My feelings would not <br /> be hurt in the least—too much to do,too little time!! <br /> Jane <br /> Jane Zimmerman, Sr Engineer <br /> City of Everett Public Works Department <br /> phone: 425-257-8885 fax: 425-257-8882 <br /> e-mail:izimmerman(oeverettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.