1.2 Proposed Construction Activities <br /> Description of site development (example: subdivision): <br /> The proposed development consists of a 115,000 square foot (ft^2) Static Test Building and <br /> improvements in support of the testing operations. <br /> Description of construction activities (example: site preparation, demolition, excavation): <br /> Construction activities will include removal of an existing spoil pile, demolition of existing <br /> lighting, utilities, and parking lot, excavation, grading, poured concrete footings, slabs, retaining <br /> walls, aprons and asphalt pavement. <br /> Description of site drainage including flow from and onto adjacent properties. Must be consistent <br /> with Site Map in Appendix A: <br /> The site consists of parking lot, spoil pile and two ponds, with drainage ditches that run to the <br /> ponds. Water from the parking lot exits the site in two locatons. Half the water from the parking <br /> lot discharges out of the NW corner of the site through 12" storm pipe while the second half <br /> discharges into the south west pond. There is a pond and ditch at the north east corner of the <br /> site where water then discharges into Boeing Lake. <br /> Description of final stabilization (example: extent of revegetation, paving, landscaping): <br /> The final stabilization will consist of concrete aprons around the building with asphalt paving <br /> outside the concrete aprons. There will be now vegetation once the project is complete. <br /> Contaminated Site Information: <br /> Proposed activities regarding contaminated soils or groundwater (example: on-site treatment <br /> system, authorized sanitary sewer discharge): <br /> Due to the contamination of the existing soils, all stormwater and indidental groundwater will be <br /> treated on site through a chitosan enhanced sand filtration (CESF) treatment system in <br /> accordance with the Administrative Order by Washington State Department of Ecology. <br /> Page 16 <br />