My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-12 2016-10-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:18:20 AM
Creation date
10/20/2016 11:07:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the discharge's turbidity is 26 to 249 NTU or the transparency is less than 33 cm but equal to <br /> or greater than 6 cm, the following steps will be conducted: <br /> 1. Review the SWPPP for compliance with Special Condition S9. Make appropriate <br /> revisions within 7 days of the date the discharge exceeded the benchmark. <br /> 2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period. <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> If the turbidity exceeds 250 NTU or the transparency is 6 cm or less at any time, the following <br /> steps will be conducted: <br /> 1. Telephone the applicable Ecology Region's Environmental Report Tracking System <br /> (ERTS) number within 24 hours. <br /> • Central Region (Benton, Chelan, Douglas, Kittitas, Klickitat, Okanogan, <br /> Yakima): (509) 575-2490 <br /> • Eastern Region (Adams, Asotin, Columbia, Ferry, Franklin, Garfield, Grant, <br /> Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman): (509) 329-3400 <br /> • Northwest Region (King, Kitsap, Island, San Juan, Skagit, Snohomish, <br /> Whatcom): (425) 649-7000 <br /> • Southwest Region (Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Lewis, <br /> Mason, Pacific, Pierce, Skamania, Thurston, Wahkiakum,): (360) 407-6300 <br /> 2. Immediately begin the process to fully implement and maintain appropriate source <br /> control and/or treatment BMPs as soon as possible. Address the problems within 10 <br /> days of the date the discharge exceeded the benchmark. If installation of necessary <br /> treatment BMPs is not feasible within 10 days, Ecology may approve additional time <br /> when the Permittee requests an extension within the initial 10-day response period <br /> 3. Document BMP implementation and maintenance in the site log book. <br /> 4. Continue to sample discharges daily until one of the following is true: <br /> • Turbidity is 25 NTU (or lower). <br /> • Transparency is 33 cm (or greater). <br /> • Compliance with the water quality limit for turbidity is achieved. <br /> 0 1 - 5 NTU over background turbidity, if background is less than 50 NTU <br /> 0 1% - 10% over background turbidity, if background is 50 NTU or greater <br /> • The discharge stops or is eliminated. <br /> Page 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.