My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-12 2016-10-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:18:20 AM
Creation date
10/20/2016 11:07:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
777X Static Test Building I 7 <br /> Table 4 - Coefficient of Subgrade Reaction <br /> Ks <br /> Bearing Soil Unit <br /> (psi) <br /> Very dense,very silty sand(Glacial Till) 100 <br /> Imported Structural Fill over Glacial Till 65 <br /> 2 Feet of Imported Structural Fill over Medium dense,silty sand(Native Soils and <br /> 60 <br /> Fill)over Glacial Till <br /> Note: pci =pounds per cubic inch <br /> Retaining Structures <br /> We understand that in order to minimize the impact on the adjacent roads, retaining walls will be <br /> constructed in the south and east portions of the site. These will be constructed as soldier pile walls. <br /> In general,the solider piles and base of the excavation will be located within the glacial till (bearing) <br /> layer on the eastern portion of the site. In the southwest corner of the site,the bearing layer drops to <br /> an elevation of 545 feet. In this area,the glacial till bearing layer is much deeper,and the soils above <br /> the till have soft layers present. Design for the south retaining wall must take into account bearing <br /> layer elevations included on Figure 2. <br /> Lateral Earth Pressures <br /> If no utilities are located in the zone of deformation,the wall may be designed using active earth <br /> pressures. If settlement-sensitive structures or utilities exist within the potential zone of deformation <br /> or if the wall system is too stiff to allow sufficient lateral movement to develop an active condition, <br /> at-rest earth pressures should be used to design the wall. Theoretically, little movement should occur <br /> behind walls properly designed and installed for at-rest conditions. <br /> The following recommendations apply to permanent building walls where drainage is provided behind <br /> the wall to prevent hydrostatic pressure buildup. Figure 3 presents our recommend earth pressures <br /> for permanent cantilevered soldier pile walls. Yielding walls are defined as those for which allowable <br /> deflection is more than 0.001 times the height of the wall (i.e., 1/8 inch for a 10 foot high wall). <br /> Lower passive pressures are necessary for the area in the southwest corner where the bearing layer is <br /> deeper and below the below the water table. Bearing layer elevations and approximate contours are <br /> provided on Figure 2 and should be used to determine what passive pressure to use at individual <br /> soldier pile locations. <br /> Footings, material stockpiles,or other large loads that are behind and adjacent to subgrade walls will <br /> impose additional lateral loads on the walls. We recommend using the surcharge pressures on <br /> Figure 4 for these loads. <br /> s� <br /> 19106-01 <br /> HAffO WSL-R May 29,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.