3003 W CASINO RD BLDG 45-12 2016-10-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:18:20 AM
Creation date
10/20/2016 11:07:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
777X Static Test Building I 13 <br /> We recommend the following for micropile installation. <br /> ■ Hart Crowser should observe micropile installation and testing to evaluate the contractor's <br /> operation and to collect and interpret the installation data. <br /> ■ The contractor and the designers must also be aware of the potential for obstructions within the <br /> fill and bearing layer. Although we have not yet encountered any significant buried debris, <br /> obstructions may be present. Major obstructions may require pile relocation. <br /> ■ To prevent interconnection of grout between piles, no two micropiles should be installed within <br /> 5 pile diameters of each other(center-to-center) in a single 12-hour period. <br /> ■ Micropiles in peat,soft silt, or loose sand materials should be cased to avoid excessive grout take. <br /> ■ The casing should be withdrawn from the hole slowly to maintain pressure on the grout column. <br /> RECOMMENDED ADDITIONAL GEOTECHNICAL SERVICES <br /> We recommend that before construction begins we review the final design plans and specifications <br /> to verify that the geotechnical engineering recommendations have been properly interpreted and <br /> implemented into the design. <br /> Monitoring, and testing by experienced geotechnical personnel should be considered an integral part <br /> of the construction process, because the performance and integrity of the structural elements of the <br /> project will depend largely on proper subgrade preparation, pile installation, and testing and <br /> construction procedures. We recommend that Hart Crowser be retained to provide these services. <br /> The purpose of our observations would be to verify compliance with design concepts and <br /> recommendations, and to allow design changes or evaluation of appropriate construction methods in <br /> the event that subsurface conditions differ from those anticipated prior to the start of construction. <br /> During project construction, we recommend that a Hart Crowser representative observe the following <br /> construction activities: <br /> ■ Micropile installation and load testing; <br /> ■ Installation of soldier piles; <br /> ■ All exposed footing subgrades(to confirm that suitable soil conditions have been reached for the <br /> proposed allowable bearing pressures); <br /> ■ Drainage installation; and <br /> ■ Placement and compaction of all structural fills. This one activity may alternatively be performed <br /> by a qualified construction testing firm. <br /> WE <br /> ALM 19106-01 <br /> HAUCITOwSME May 29,2015 <br />