Laserfiche WebLink
Dates) 01/25/08 Logged AKF Checked DCO <br /> Drilled By By <br /> Drilling Boart Longyearlhlolt Drilling DrillingHollow-stem Auger Sampling SPT <br /> Contractor Methods <br /> Auger 4.5-inch ID Hammer 140 Ib hammer/30 In drop Drilling Track-mounted <br /> Data Data automatic Equipment <br /> Total 50.4 Surface 570 Groundwater Not Encountered <br /> Depth(it) Elevation(ft) Elevation(ft) <br /> Vertical Datum Fasting(x)- <br /> Datum System Northing(y): <br /> SAMPLES <br /> m E <br /> E v OTHER TESTS <br /> g v Z > _ MATERIAL DESCRIPTION m o AND NOTES <br /> (11 L m J U - <br /> N m Z > � z <br /> fn 2 <br /> W O «� m m m <br /> lY [L cn C7 J CO rn U D'S <br /> 70 0 SP-SM Brown to gray fine to medium sand with silt and <br /> occasional gravel(medium dense,moist to wet)(fill) <br /> SM Gray silty fine to medium sand(very loose,wet)(fill) <br /> 565 5 7 P 1 13 <br /> SP-SM Gray sand with silt and occasional gravel(medium <br /> dense,moist)(fill) <br /> 10 <br /> 10 23 Z 12 <br /> SM Bark brown to gray silty fine sand with occasional <br /> gravel and organic matter(loose,moist)(fill) <br /> 55 15 11 7 3 <br /> 550 20 12 10 4 <br /> 3 <br /> 0 <br /> 0 <br /> Z <br /> w <br /> C7 <br /> a <br /> ce <br /> 545 25 0 50r2" S <br /> w <br /> a <br /> R <br /> n <br /> sSP-SM Gray to brown fine sand with silt and occasional wood <br /> 30 fragments(medium dense,moist)(fill?) <br /> Note:See Figure A-1 for explanation of symbols. <br /> N <br /> LOG OF BORING GEI-14 <br /> Project: Boeing Flightiine Phase 2A <br /> G EO E N G[N E E RProject Location: Everett,Washington Figure A-3 <br /> Project Number: 0120-252-01 Sheet 1 of 2 <br />