My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-12 2016-10-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:18:20 AM
Creation date
10/20/2016 11:07:00 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATIC TEST FACILITY PRELIMINARY STORM DRAINAGE REPORT <br /> EVERETT,WASHINGTON <br /> SECTION 3: OFFSITE ANALYSIS <br /> Upstream: <br /> The project located is located on an existing preload/spoil pile site and therefore does not receive any <br /> surface run-on stormwater, however, a culvert located at the northeast corner discharges stormwater into <br /> the existing ditch at the northeast corner of the site. The ditch has been recently reconstructed as a part of <br /> the remediation efforts to remove contaminated soils. The ditch mostly receives stormwater from the <br /> detention facility for the newly constructed S5 Parking Lot to the east. This stormwater flows westward <br /> within the ditch approximately 170' where it enters into a 12" CMP culvert. Stormwater flows northward <br /> through the culvert under 94"' St. SW and discharges into Wetland #13. The ditch has been preliminary <br /> jurisdictional determination from the Department of Army Engineers. JVb 8c e i <br /> Downstream: J <br /> Inspector: Dean A.Furr <br /> Dates of Field Inspection: 1/6/15 at 11:30am <br /> Weather Conditions: Partly cloudy with temperatures in the range of upper 40's to low 50's. <br /> The site currently has the temporary S4 parking lot to the west adjacent to the flightline and a large spoil <br /> pile to the east. Stormwater discharges from the project area at 3 Discharge Points (DP). <br /> DP#1, located at the northwest corner, receives surface water from the majority of the north half of the <br /> parking lot and the north half of the spoil pile. The stormwater is conveyed through a pipe network in <br /> westerly direction for approximately 1,400 LF where it enters an Oil Water Separator #EV-157. The <br /> stormwater continues northward for approximately 170LF where it enters a 54" SD Main. <br /> DP#2, receives stormwater from the south half of the parking lot and the spoil pile. The stormwater enters <br /> a 12" SD at the west end of the sediment pond located in the southwest corner of the site. The stormwater <br /> is conveyed westward for approximately 1,000LF along south side of the Flightline and turns northward. <br /> The stormwater is conveyed within a 36"SD for approximately 90OLF where it converges with stormwater <br /> from POC#2 at the entrance into Oil Water Separator#EV-157. <br /> DP#3, receives stormwater from the emergency overflow of Pond D and the discharge form the east as <br /> described in the Upstream portion of this section. Stormwater flows in a northwest direction for <br /> approximately 90OLF through Wetland#13 and Boeing Lake where it enters the 54"SD main as described <br /> in POC#1. Stormwater flows westward for approximately 750LF where it converges with stormwater form <br /> POC's#1 and#2. See the Offsite Analysis Exhibit 1 at the end of this Section. <br /> CEI Project#141001 Pg.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.