My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/10/12 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/10/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 11:31:07 AM
Creation date
10/20/2016 11:30:37 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run Date: 12/8/2015 City of Everett-Public Works Department Cutoff Date: 11/20/2015 <br /> Time: 12:30 PM Contract Estimate Voucher <br /> Project:317 For Work Order#3251 B Contractor: FRANK COLUCCIO CONSTRUCTION <br /> TRANSMISSION LINE#6-PILCHUCK Estimate#13 9600 M.L.KING JR.WAY SOUTH <br /> RIVER CROSSING <br /> WO 3251B BID:$3,609,685,62 SEATTLE,WA 98118 <br /> TOTAL BID:$3,609,685.62 <br /> FINAL <br /> Total Amt Previous Amt Present Amt <br /> Contract Totals to Date $3,609,685.62 $3,371,545.32 $238,140.30 <br /> Retained Amounts $0.00 $0,00 $0.00 <br /> State Tax Amounts $310,432.91 $289,952.90 $20,480.07 <br /> Amounts Paid $3,920,118,51 $3,661,498.22 <br /> N <br /> Amount to be Paid This Estimate $258,620.37 <br /> f <br /> Checked By ` ,. Date 12-1FI1S <br /> Recommended By r Date 211_/„.„5:1 <br /> Public Works Director_ / er/ Date (2-- <br /> _ <br /> RECORD DRAM Nt CHECKOFF <br /> FF <br /> uatp,. Retainage not wiheld <br /> per Retainage Bond <br /> Work Order Number: 3251B 02 302 !/0 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.