My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3904 FEDERAL AVE 2016-10-20
>
Address Records
>
FEDERAL AVE
>
3904
>
3904 FEDERAL AVE 2016-10-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 2:09:35 PM
Creation date
10/20/2016 2:09:23 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3904
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELFOR(0' Belfor Property Restoration <br /> PROPERTY STORATIOR <br /> 4320 S. 131st Place Suite#100 <br /> Seattle,WA 98168 <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 119. Paneling 98.38 SF @ 2.14= 210.54 <br /> Paneling is wet and saturated with smoke.Allowing to replace. <br /> 120. Stain&finish paneling 98.38 SF @ 1.14= 112.15 <br /> 121. Wallpaper-High grade 32.79 SF @ 2.71 = 88.86 <br /> Wall paper around vanity area and medicine cabinet. <br /> 122. Prep wall for wallpaper 32.79 SF @ 0.34= 11.15 <br /> 123. Acoustic ceiling tile 43.75 SF @ 3.59= 157.07 <br /> 124. Seal floor or ceiling joist system(shellac) 43.75 SF @ 0.97= 42.44 <br /> 125. Shower curtain rod-Detach&reset 1.00 EA @ 12.91 = 12.91 <br /> 126. Interior door-Detach&reset-slab only 1.00 EA @ 15.51 = 15.51 <br /> 127. Medicine cabinet-Detach&reset 1.00 EA @ 35.74= 35.74 <br /> Detach and reset medicine cabinet and light fixture combo.Mitigation cleaning was delayed due to the need for asbestos abatement. <br /> If fixtures are corroded then they will need to be replaced. <br /> 128. Light fixture 1.00 EA @ 43.95= 43.95 <br /> 129. Wallpaper Hanger-per hour 1.50 HR @ 41.03= 61.55 <br /> Additional time to remove and replace wallpaper around vanity. <br /> 130. Toilet-Detach&reset 1.00 EA @ 235.41 = 235.41 <br /> 131. Plumbing fixture supply line 2.00 EA @ 22.73= 45.46 <br /> Remove and replace supply lines and stops due to replacement of paneling. <br /> 132. Angle stop valve 2.00 EA @ 37.58= 75.16 <br /> 133. Bath accessory 2.00 EA @ 13.59= 27.18 <br /> 134. Light fixture 1.00 EA @ 64.52= 64.52 <br /> Downstairs Hall Height:7' <br /> Door 2'9"X 6'8" Opens into DOWNSTAIRS_B <br /> Door 2'6"X 6'8" Opens into RECREATION_R <br /> Door 2'6"X 6'8" Opens into ROOM2 <br /> Door 2' 6"X 6'8" Opens into LAUNDRY-ROOM <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 135. Paneling 120.39 SF @ 2.14= 257.64 <br /> Paneling is wet and saturated with smoke.Allowing to replace. <br /> 136. Stain&finish paneling 120.39 SF @ 1.14= 137.24 <br /> 137. Seal the walls w/oil based/hybrid stain blocker-one coat 120.39 SF @ 0.47= 56.58 <br /> 138. Seal/prime then paint the ceiling(2 coats) 42.92 SF @ 0.65= 27.90 <br /> 139. Mask and prep for paint-plastic,paper,tape(per LF) 26.96 LF @ 0.96= 25.88 <br /> 140. Medicine cabinet-Detach&reset 2.00 EA @ 35.74= 71.48 <br /> 141. Casing-2 1/4" stain grade 66.00 LF @ 2.83= 186.78 <br /> 142. Stain&finish casing 66.00 LF @ 1.07= 70.62 <br /> Casing around doors will not cost effectively detach and reset when the paneling comes off. Stain to match new paneling. <br /> LIZABETH_HAUFLEI 5/29/2015 Page: 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.